Laserfiche WebLink
PE #3 <br />61/2 Street/Ouinn Avenue -STREET <br />Omann Contracting Companies <br />6551 Labeaux Avenue NE <br />Albertville, MN 55301 <br />Date of Work Performed: <br />Street <br />November 1-31, 2018 <br />1 Common Excavation/Embankment (includes subgrade preparation) <br />CY <br />1,834.00 <br />1,834 <br />$ 18.98 <br />$ <br />2 Curb Removal <br />LF <br />100.00 <br />101 <br />$ 6.00 <br />$ <br />3 Remove Bituminous Pavement <br />SY <br />1,400.00 <br />1,400 <br />$ 2.55 <br />$ <br />4 Salvage & Re -spread Topsoil <br />LS <br />1.00 <br />1.0 <br />$ <br />$ 8,100.00 <br />5 Class 5 Aggregate Base Course -10" Depth <br />TON <br />2,200.00 <br />2,809.01 <br />$ 12.45 <br />$ <br />6 Aggregate Surfacing (to match existing Driveways) <br />TON <br />40.00 <br />18.6 <br />$ <br />$ 29.50 <br />7 Bituminous Base Course - 2.5" Depth <br />TON <br />615.00 <br />572.57 <br />$ 74.50 <br />$ <br />8 Bituminous Wear Course -2"Depth <br />TON <br />500.00 <br />7.39 <br />$ 79.80 <br />$ <br />9 Tack Coat <br />GAL <br />200.00 <br />0 <br />$ 3.00 <br />$ <br />10 Seeding - Boulevard - Mix No. 25-121 <br />BY <br />3,100.00 <br />2,800 <br />$ 0.83 <br />$ <br />11 Hydraulic Soil Stabilizer- Type 5 <br />SY <br />4,200.00 <br />2,800 <br />$ 1.14 <br />$ <br />12 Adjust Casting (New CBs, Ex Valves, Ex, San Sewer) <br />EA <br />11.00 <br />11 <br />$ 430.00 <br />$ <br />Less Previous Payments 76,207.84 <br />TOTAL PE 3. STREET $ 59,890.56 <br />Approved by: Ir <br />Original Quote: $174,057.82 <br />Previous Payements: $ 76,207.84 <br />