Laserfiche WebLink
a <br />PROPOSED NEW GOAL <br />3. Establish a corridor through the central part of the community <br />for an ultimate east -west roadway. <br />POLICIES: <br />■ Work cooperative with Anoka and Sherburne County. <br />Highway departments to have roadway located in accordance <br />with their long range plans. <br />■ The selected route must be sensitive to existing residential <br />homes, environmental areas, wetlands, existing public parks, <br />and open space. <br />■ The selected route should assist in alleviating anticipated traffic <br />problems from roads that are identified as being deficient in the <br />transportation plan. <br />Existing roadways and right of way shall be used as much as <br />possible to minimize costs for right-of-way acquisition. <br />�.YI�IDJF�9x9F:�R:S7 <br />