Laserfiche WebLink
The fee is for protecting and improving the quality of our water resources. Surface water management <br />projects investigate local flooding issues such as flooding from sewers, drains, groundwater, and runoff <br />from land, small watercourses and ditches that occur as a result of heavy rainfall. <br /> <br />ERX states that they understand the reason for the Surface Water Management Fee if they were actually <br />building houses or buildings. The land they platted is dirt, is not permanent, and can change. The <br />property can be turned back into a natural landscape. <br /> <br />Regardless of the development timeline, these fees are collected at the time of platting, per resolution, to <br />ensure the funds are in place for future development. There is no mechanism to collect these fees after <br />land is platted. <br /> <br />Attachments <br /> 2018 Fee Schedule (portion) <br /> Resolution 94-110 <br /> Informational Fee Sheet <br /> <br /> <br />N:\\Public Bodies\\Agenda Packets\\12-03-2018\\Final\\10.1 sr.docx <br />