Laserfiche WebLink
20192023 <br />thru <br />Capital Improvement Plan <br />Storm Water <br />Department <br />City of Elk River, Minnesota <br />Storm Water Coordinator <br />Contact <br />Maintenance <br />Type <br />Project # <br />STM-1 <br />Useful LifeUnassigned <br />Project Name <br />Storm Water projects <br />Maintenance Projects <br />Category <br /> Description <br />Bi-annual pond cleaning, stormwater repairs, BMP inventory. <br />2019 - Lion's Park Pond - Phase II <br />2021 - Dodge Ave south of 8th St - Basin 197 <br />2023 - Trott Brook <br />Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet. <br /> Justification <br />These bi-annual projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the <br />storm water system is functioning as designed and achieving the water quality standards of our NPDES permit. <br />The smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas. <br />ExpendituresTotal <br />20192020202120222023 <br />Construction/Maintenance 500,000200,000250,000950,000 <br />500,000200,000250,000950,000 <br />Total <br />Funding Sources20192020202120222023Total <br />Storm Water <br />500,000200,000250,000950,000 <br />500,000200,000250,000950,000 <br />Total <br />2019-2023 CAPITAL IMPROVEMENT PLANPage 44 <br />