My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. HRSR 12-03-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2018
>
12-03-2018
>
8.2. HRSR 12-03-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:19:36 AM
Creation date
11/29/2018 1:17:36 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
12/3/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To change a specification due to unforeseen difficulties arising after work has started <br /> To address a deficiency that was inadvertently dropped from the project during scope of work <br />origination <br /> To approve changes in the contract time period <br /> <br />Owner Participation: Homeowners are expected to participate in their project by communicating with <br />contractors when they have questions about work items, scheduling or any other concerns that may arise. It <br />is expected that homeowners and contractors will communicate any issues or problems that arise to CMHP <br />staff. Homeowners are not allowed to complete work, or perform “sweat equity”. Only licensed contractors <br />will be allowed to complete needed work. NOTE: if a homeowner is a licensed contractor with a current <br />license and insurance coverage, they will be allowed to complete work on their home, and only materials will <br />be covered by the program. <br /> <br />Termination of Contract: A contractor’s contract may be terminated by the homeowner due to the <br />following circumstances: <br /> Poor work performance on the job site and the demonstrated inability to rectify poor workmanship <br /> Contractor is causing undue damages to the property and showing an inability or unwillingness to <br />correct the damages. The cost of repairing damages will be deducted from any money owed the <br />contractor for work already completed <br /> Where collusion or fraud has been determined to exist on the part of the contractor <br /> Lack of sufficient insurance coverage <br /> Inability of the contractor to perform the work within the allotted time <br /> Irreconcilable and irresolvable differences between the contractor and the owner <br /> <br />The cost of repairing poor workmanship and the higher costs of awarding the bid to another bidding <br />contractor shall be deducted from any amount owed to the initial contractor for work completed. In all <br />cases, the contractor shall be given the opportunity to rectify the problem before contract cancellation <br />procedures are instituted. CMHP shall adhere to the following procedures when negotiating a workmanship <br />problem: <br /> A meeting will be scheduled at the job site with the contractor and homeowner to attempt to come <br />to a consensus about the problem and solution <br /> If problem persists, CMHP shall contact the contractor by certified mail notifying the contractor <br />that the workmanship is still poor and specifying areas that need to be addressed to satisfy the <br />contract. The letter will give the contractor fifteen (15) days to make the required repairs <br /> Contractors who are removed from a contract shall be removed from the participating contractor’s <br />list and shall be prohibited from bidding on projects. <br /> <br />Project Close-Out: At the time of project completion, the following steps will be taken to close out the <br />project: <br /> A final draw/ inspection will be scheduled to confirm that all work has been done according the <br />contract and to execute final draw form, final lien waiver and completion certificate <br /> Draw requests will be submitted by CMHP for final payment <br /> Lead based paint clearance inspection is ordered and completed (if applicable) <br /> <br /> <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.