Laserfiche WebLink
<br /> <br />Memorandum <br /> <br /> <br /> <br /> <br /> <br />To: Planning Department <br /> <br />From: Amanda Bednar, Environmental <br /> <br />Date: November 6, 2018 <br /> <br />Subject: Site Plan Review – November 2018 <br />_______________________________________________________________________ <br /> <br />The department listed above has reviewed the application listed below and has the following <br />comments: <br /> <br />Case #V 18-09 Gerald R. Sizer – Variance <br /> <br />1. No concerns or issues with the application as proposed for additional structures than <br />is permitted. However there are significant wetland complexes on both parcels. Any new <br />structure will need to meet the required wetland setbacks and a wetland delineation may be <br />required. <br /> <br /> <br />Case #CU 18-18 John Anderson – Conditional Use Permit <br /> <br /> <br />1. This property borders a large wetland complex to the north which is a public water <br />wetland and containers a natural environment lake (unnamed DNR ID#71023800). Per Elk <br />River City Code Section 30-2022 (a)(4) commercial or industrial uses without water-oriented <br />needs must be set back double the normal ordinary high-water level setback which is 300’ <br />feet in this location and should not be an issue based on submitted documents. Additionally <br />substantial screening from view from the water is required, which should be achieved by the <br />natural wooded area present on site. Anything modifications to the application that could <br />change these items would need to be reviewed. <br />All wetland buffer and buffer setbacks must be met for any new buildings, paving or other <br />impervious surface. A wetland delineation may be required to determine accurate wetland <br />boundary and ensure all setbacks are met. <br /> <br /> <br />Case #V 18-10 Jared Bradford / Union Church - Variance <br /> <br />1. No concerns or issues with the application as proposed.