Laserfiche WebLink
Elk River Municipal Utilities <br />Proposed 2019 Utilities Fee Schedule <br />Fee Description <br />ELECTRIC <br />2018 <br />Proposed <br />2019 <br />Proposed <br />Increase <br />New Residential Electric Connection - Developer - Lot with ERMU water service <br />$ <br />475.00 <br />$ <br />475.00 <br />New Residential Electric Connection - Developer - Lot without ERMU water service <br />$ <br />575.00 <br />$ <br />575.00 <br />New Residential Electric Connection - Builder <br />$ <br />875.00 <br />$ <br />875.00 <br />New Wire Footages over 200'(per foot) <br />$ <br />4.00 <br />$ <br />4.00 <br />New Seirvice Frost Trenching (per foot) <br />$ <br />5.00 <br />$ <br />5.00 <br />New Commercial & Industrial Electric Conne,:tion <br />50% <br />50% <br />Semite Upgrades or Additions for Existing Customers <br />100% <br />100% <br />Minimum Temporary Electric Service Fee - Existing Transformer <br />$ <br />150.00 <br />$ <br />150.00 <br />Minimum Temporary Electric Service Fee - Without Existing Transformer <br />$ <br />500.00 <br />$ <br />500.00 <br />Street Light - 30' Decorative Pole with 6' Arm and Fixture <br />$ <br />1,850.00 <br />$ <br />1,850.00 <br />Street Light - 23' Decorative Pole with Traditionaire Fixture <br />$ <br />1,500.00 <br />$ <br />1,500.00 <br />Security Light - Wood Pole with Fixture <br />$ <br />975.00 <br />$ <br />975.00 <br />Se,curity Light - Existing Pole <br />$ <br />125.00 <br />$ <br />125.00 <br />Pole Attachment Fee (per pole) <br />$ <br />6.50 <br />$ <br />6.50 <br />WATER <br />Water Access Charge = Water Connection Charge + Water Availability Charge <br />$ <br />3,633.00 <br />$ <br />3,764.00 <br />3.6% <br />Water Connection Charge (Per Plumbing Unit) - Builder <br />$ <br />3,278.00 <br />$ <br />3,396.00 <br />3.6% <br />Water Availability Charge (Per Plumbing Unit) - Developer <br />$ <br />355.00 <br />$ <br />368.00 <br />3.6% <br />Abandoned Water Service <br />$ <br />2,500.00 <br />$ <br />2,500.00 <br />Hydrant Water Sales - Rental (per week) <br />$50.00 <br />$50.00 <br />Hydrant Water Sales - Units (per 1000 gallons) <br />$ <br />4.00 <br />$ <br />4.00 <br />Deposit for 5/8" Hydrant Meter <br />$ <br />150.00 <br />$ <br />150.00 <br />Deposit for 2 112" Hydrant Meter <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />Private Hydrant Maintenance Program Monthly Fee <br />$ <br />5.00 <br />$ <br />5.00 <br />ADMINISTRATIVE <br />Administrative Fee for Continued Submission of Checks After No -Check Notice iven <br />20.uu <br />$ <br />20.00 <br />Billable Cost of Materials Markup <br />15% <br />15% <br />Billable Labor Markup <br />55% <br />55% <br />Billable Vehicle I Equipment (per employee per hour) <br />$ <br />30.00 <br />$ <br />30.00 <br />Commercial Application Fee <br />$ <br />20.00 <br />$ <br />20.00 <br />Electric Service Disconnect/Trip Fee - Meter Technician <br />$ <br />50.00 <br />$ <br />50.00 <br />Electric Service Disconnect/Trip Fee - Line Crew <br />$ <br />150.00 <br />$ <br />150.00 <br />Energy Audit <br />$ <br />150.00 <br />$ <br />150.00 <br />Meter Tampering Fee <br />$ <br />250.00 <br />$ <br />250.00 <br />Meter Testing Fee <br />$ <br />50.00 <br />$ <br />50.00 <br />NSF Fee <br />$ <br />30.00 <br />$ <br />20.00 <br />Decrease <br />Penalty Amount <br />10% <br />10% <br />Photocopies (per page) <br />$0.25 <br />$0.25 <br />Red Tag Handling Fee <br />$ <br />20.00 <br />$ <br />20.00 <br />Water Shut -Off Fee <br />$ <br />100.00 <br />$ <br />100.00 <br />77 <br />