My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EDA HANDOUT 10-15-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2018
>
10-15-2018 SPECIAL
>
EDA HANDOUT 10-15-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 3:03:45 PM
Creation date
10/17/2018 3:02:58 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
10/15/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Siting Needs cont. <br />Proposed <br />❑ Administrative Office ❑ Manufacturing/Assembly/Packaging/Processing <br />❑ Research and Development ❑ Other <br />Zoning Needs <br />❑ Heavy Industrial ❑ Light Industrial ❑ Business Park <br />Minimum Acres Required Maximum Acres <br />Total Building Square Feet Required <br />• Office sq. ft. <br />• Production sq. ft. <br />• Refrigeration sq. ft. <br />• Desired area per floor sq. h. <br />• Truck Door(s) Required (total) <br />❑ loading dock(s) ❑ drive-in(s) <br />• Describe Outdoor Storage Needs <br />• Describe Type of <br />• Parking Space Needs # spaces <br />❑ Warehouse/Distribution <br />❑ Service/Commercial <br />• Warehouse sq. ft. <br />• Clean Room so. ft. <br />• Other sq. ft. <br />• Ceiling Clear Height Required ft. <br />• High Visibility ❑ Critical ❑ Highly Desirable ❑ Desirable ❑ Neutral/NA <br />Future Expansion Need (acres/sq.ft.) <br />Other Building Requirements <br />Ownership/Leasehold Interest <br />❑ Existing building (purchase/lease) ❑ New construction (awn/lease) (years) ❑ Preferred length of lease <br />Page 2 of 4 <br />Confrdcmtial <br />
The URL can be used to link to this page
Your browser does not support the video tag.