My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 10-09-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
10-09-2018
>
5.3 ERMUSR 10-09-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 3:24:12 PM
Creation date
10/5/2018 3:24:12 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River 2018 Utilities Fee Schedule <br /> Municipal Utilities <br /> ELECTRIC <br /> New Residential Electric Connection -Developer-Lot with ERMU water service $475.00 <br /> New Residential Electric Connection -Developer-Lot without ERMU water service $575.00 <br /> New Residential Electric Connection -Builder $875.00 <br /> New Wire Footages over 200'(per foot) $4.00 <br /> New Service Frost Trenching(per foot) $5.00 <br /> New Commercial&Industrial Electric Connection 50% <br /> Service Upgrades or Additions for Existing Customers 100% <br /> Minimum Temporary Electric Service Fee-Existing Transformer $150.00 <br /> Minimum Temporary Electric Service Fee-Without Existing Transformer $500.00 <br /> Street Light-30' Decorative Pole with 6'Arm and Fixture $1,850.00 <br /> Street Light-23' Decorative Pole with Traditionaire Fixture $1,500.00 <br /> Security Light-Wood Pole with Fixture $975.00 <br /> Security Light- Existing Pole $125.00 <br /> Pole Attachment Fee(per pole) $6.50 <br /> WATER <br /> Water Access Charge=Water Connection Charge+Water Availability Charge $3,633.00 <br /> Water Connection Charge(Per Plumbing Unit)- Builder $3,278.00 <br /> Water Availability Charge(Per Plumbing Unit)- Developer $355.00 <br /> Abandoned Water Service $2,500.00 <br /> Hydrant Water Sales- Rental (per week) $50.00 <br /> Hydrant Water Sales- Units(per 1000 gallons) $4.00 <br /> Deposit for 5/8"Hydrant Meter $150.00 <br /> Deposit for 2 1/2"Hydrant Meter $1,000.00 <br /> Private Hydrant Maintenance Program Monthly Fee $5.00 <br /> ADMINISTRATIVE <br /> Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00 <br /> Billable Cost of Materials Markup 15% <br /> Billable Labor Markup 55% <br /> Billable Vehicle/Equipment(per employee per hour) $30.00 <br /> Commerical Application Fee $20.00 <br /> Electric Service Disconnect/Trip Fee- Meter Technician $50.00 <br /> Electric Service Disconnect/Trip Fee- Line Crew $150.00 <br /> Energy Audit $150.00 <br /> Meter Tampering Fee $250.00 <br /> Meter Testing Fee $50.00 <br /> NSF Fee $30.00 <br /> Penalty Amount 10% <br /> Photocopies (per page) $0.25 <br /> Red Tag Handling Fee $20.00 <br /> Water Shut-Off Fee $100.00 <br /> Adopted by the Utilities Commission on October 10,2017 under authority per Minnesota Statute 412.361-Amended April 10,2018 <br /> 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.