Laserfiche WebLink
<br />In fur. Richardsons report it was set for that the <br />Elk River h~/dro_electric plant at the present time is <br />good for less than (50) kilowatts continuo~sly and that <br />during the YEar 1931 the .i1.lk River Qrower &: Light Co. <br />generated approximatel:r 514.804 kilowatt hours and pur_ .. <br />chased B08.6oo, a total of 1323.404, of which they sold ~ <br />1.004.094, showing an energy losb of 319 310 kilowatt <br />hours of 24%. The average price received'for current by <br />the Blk River Power& Light Co appears to be 6,03 cents <br />per kilowatt hour, <br />The Ek. River Power & Light co, in 1931 paid~t66 ~~ <br />as local Village taxes. The Village paid to the ~lk Rlv6r <br />Power & Light Co in 1~31, $2 763,11 for electrical energy <br />consumed b~ pumping, street iJ.ghts, etc, <br />~ew rates recentlJI pU": into force by the eastern <br />kinnesota Power Co amount to an B_cent rate net for the ' <br />first kilowatt hours used per month and all over, ~cents, <br />with a minimum net mmnthly bill of $1,19, Their other <br />rates are in a cOI'respondingly desirable ratio. These are <br />cited because the towns served are of comparable size and <br />even further from the Twin Cities than Elk River, <br />The cost of a new municipal plant complete, in_ <br />cluding all replacement meters complete new modern and <br />afficient electric distribution system with new street <br />lights, etc" is approximately $100.000. The cost mf a <br />complete new white way system is approximately $6,740,00 <br />,~~ This plant #would be the last word in modern design <br />and construction and would be as efficient as any plan~ . <br />of this capacity could be designed, <br />Allowing a liberal aet up for cost of labor, in_ <br />surance, fuel and all other items entering into the cost <br />of operation of a plant of this nature, it is anticipated .. <br />that at the end of the fefteen years all bonds could be .. <br />retired and a combined replacement and accumulated re_ <br />served fend of S9C oc6,9B would be established. At the ed <br />end of that time, allowing t2C 000 for additional plant <br />extensions, with all theGe betterments taken care of by <br />the twentif;th vearl.. there will.be a combine(l. replacement <br />and accumulatea re~erve amountJ.ng to approxJ.mately <br />$152.051.42. . <br />Plans showing the prcse~t electric ~istributJ.on <br />system, the propesed new electrJ.c distrJ.butJ.on system <br />a washed drawing showin~ the new power plant and a pre~ <br />liminary plan snowing tHe machinery placement ih the new <br />power plant have been submitted and may be seen b~T a~yone <br />interested. <br /> <br />No further business~ meeting adjourned, <br /> <br />'--.-___ '_".N <br /> <br />:- ~Ll':L:.L~~:'.\.,=_:>_. <br /> <br />e <br />