Laserfiche WebLink
Per the vacation shown on our site plan, we feel this will allow better use of the parking and allow a <br />maintenance agreement to be added into the final approvals. The street show has no relation to the <br />final approved use. <br />As the submittal shows we are requesting a P.U.D application on this project. The current <br />comprehensive plan calls for the RIVER WALK use to exist, see the City of Elk River domestic report. <br />In relation to the SELVE STORAGE facility, this will bring a convenience factor to not only our users, but <br />the greater Elk River community. The architecture requires the space to be a 100% under roof use and <br />will also not require the parking that would be mandatory for another apartment use, therefore a green <br />space factor to be considered. <br />As for the remaining Saxon site, we are proposing a future controlled temperature environment facility <br />storage complex that has no out -side storage. This complex would be a state of the art high security <br />building. The design will tie in nicely to the proposed design of the multi- family concept (see concept <br />design). <br />This facility only requires a small amount of parking allowing a proof of parking application for the multi- <br />family concept we are proposing, <br />The remaining space will be green space. Also keeping in mind there is no other storage facility use like <br />this anywhere in close proximity to this location. <br />Keeping in mind, we are not submitting approval documentation for the storage concept, we feel it <br />necessary and would like to discuss the entire concept of this space throughout. <br />We look forward to the efforts in partnership to re -develop this site to a much-needed updated use for <br />the city of Elk River. <br />Daniel J. Andersen <br />Vice President of Commercial Development <br />The Briggs Company <br />612-812-3324 <br />