Laserfiche WebLink
� T <br /> � LT FENCE <br /> � <br /> SV A \I a <br /> l r35LFFDPE— \ _.. i GH#3 <br /> =3sLE _ 1 RIM=aas 5O / 1 \ <br /> I2 HOPE <br /> s=loa9 INv=86261 \ <br /> \ S-all <br /> as i <br /> L ISLE <br /> Iz EEs� <br /> \-� A � � � 1 � � I I 1 1 I I ��11� 1 1 �wL RPPAP iy ►-. ,�--� � � a��C \I 1'A V ".� <br /> - <br /> V <br /> V <br /> \ \ 1 1 MH#2 \ \ <br /> INFILTRATION BASIN RIM 88820 <br /> �,RACT'�C <br /> E, <br /> IN <br /> V I I I I I \ A A V A A v TOP Bes Oo Iz'HOPe V INV-884100 <br /> Oo <br /> eOL-7, oo "'� OB#3 39LE - <br /> \ <br /> VOL-7,acE <br /> RIM 889.85 \ \ \ <br /> MH y2 T A A Nv=e83.60 <br /> RIM=884.00` 1 \ Y \ <br /> my-aT9 oo 1 A NE wFaTRBOT-BASH I V� A Q <br /> \\ \ 1 1 I = TOP-889.00 \', <br /> \ \ 1 \ 1 01 FT. SETBACK FROM I_ / I \ \ \1 11 �T A BOT-144OF- <br /> \ 1 I / Y / ) '\1 V� A 1 ' 1 VOL-8,144 OF <br /> A A <br /> Y \ ASE FLOOD..E� L ITO_P QF \ \ <br /> \ 1 100 YR 7d <br /> 1 LIEVATION BOUNDARY 1 / [� 1 A A \�g�� F( 'F( CK W, 1 iz"FES <br /> W RIPRAP <br /> INV=885.00 \ \ <br /> I _ <br /> V A 11 II 1 �1 SILT FENCE 1 1 III I I 1 1 PROPOSED �j BM TNH <br /> V 1 1 1 1 I 1 1 1 1 1 L 12"HOPE JB1 V -- <br /> 11 WEST MFILTRATION BARIN� I A 4-STORY 1 ELEV= 893.17 <br /> V 1 1 TOP -65.00 i\ 1 1 1 L=evoLF V \ 1 P 1 <br /> l o I s=ossr V A _ - APARTMENT \ <br /> $DT.=861.00 <br /> �1 1 VOL 3411 OF — \ <br /> 1 IT' <br /> BUILDING� A=34.058 SF <br /> FB^ <br /> 1 1 �, NI xa I V° FFE=890.00 > <br /> �I2 HDPE 1 RIM 86320 V <br /> \ WOODELyVA` V L=3I LF INv-863.zO�I �I ( GFE=879.50 ` m <br /> eo <br /> \ s-a6s� I 1 I o 4 <br /> \\ VAVA V 11 II 3 I SIB \cuT iv/- _ 12 HDP- <br /> W RIPRAP 1\ RAIN GUTARDIAN .—-- L=163LF sf� U <br /> V T S- S2% <br /> INIv=s163.00 t i >a ( <br /> a o <br /> 1 ` <br /> �XA, <br /> zoB,F- <br /> 1-1.111.68 <br /> I <br /> 336,3 asa� 63033 <br /> 3333, 1 SII <br /> OR <br /> i <br /> S-410' <br /> as aaa. R� z-z <br /> 30333 :. <br /> � ` <br /> J ae <br /> Mrl\ . =e ee <br /> 1 A <br /> ENTRANCE Z <br /> e ,e a� <br /> � A ENTRANCE (n <br /> \ o� <br /> w <br /> ae,e <br /> 1 I 1 RIM 883.00 12"HDPE mean \\� ADJUST EX.CB eae os \\ LL <br /> L Q <br /> INV—d]].52 L=39LF ADJ5CKR MT 886 25 RIM=886.90 / <br /> �pp�77 YR AS FL�pO _ l __ — — — U <br /> L ON UIND R _ / \ < z11 <br /> Ln <br /> \ �apwLET PROTECTION(TVP) eee H C9 Q M' <br /> \ ` / <br /> CONNECT TO <br /> O <br /> IE saz3o Iz"HDPE <br /> / =i5% <br /> Q1 <br /> ON <br /> RIM 883.72 m m SILT FENCE _ 1 <br /> --- <br /> BIV <br /> �f 1� w <br />�� !l VV00 A z ELEV= 888TNH <br /> 62 <br /> j6 DoWL <br /> I I H-— <br /> a TRACT D �a_LL <br /> Doe <br /> EXISTING BUILDING (/ <br /> : I <br /> FEE= 884.88 U <br /> NOTES: C�L <br />'TOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATIONS,AND RIM AND INVERT ELEVATIONS,OF EXISTING DRAINAGE AND SANITARY STRUCTURES.LOCATION AND SIZE OF EXISTING SANITARY,WATER,AND STORM J U` <br />'TUBS,AND EXISTING GRADES SHALL ALSO BE VERIFIED. FL-rl <br /> TOPOGRAPHICAL INFORMATION WAS OBTAINED FROM A TOPOGRAPHICAL SURVEY FROM BOGART PEDERSON AND ASSOCIATES,BECKER,MN. N GRADING & ESC PLAN m c <br /> =30' <br /> IRK: BM=893.17(TOP NUT HYDRANT), W W d <br />:NGINEER IMMEDIATELY IF ANY DISCREPANCIES ARE DISCOVERED BETWEEN THE EXISTING CONDITIONS AND THE CONDITIONS NOTED ON THE PLANS,WHICH ARE SIGNIFICANT ENOUGH TO ALTER THE INTENT OF THE DRAWINGS. 'W r <br /> RED BY THE MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY,THE OWNER OR CONTRACTOR SHALL OBTAIN A PLUMBING PERMIT PRIOR TO THE INSTALLATION OF ANY STORM SEWER UTILITIES. <br /> SHEEP N0. <br /> ILL UTILITY COMPANIES WITH UTILITIES IN THE PROJECT AREA BEFORE THE START OF CONSTRUCTION AND VERIFY LOCATIONS OF UTILITIES BEFORE BEGINNING WORK. ■, <br />:TOR SHALL PERFORM CALCULATIONS TO VERIFY EARTHWORK QUANTITIES.CONTRACTOR'S BID/QUOTE SHALL BE BASED ON HIS/HER OWN EARTHWORK CALCULATIONS. REVIEW PLAN C2 <br /> EVATIONS ARE TOP OF CURB AND FLOW LINE AND/OR FINISHED GRADES,UNLESS OTHERWISE INDICATED BY THE LOCATION OF THE SPOT.PROPOSED ELEVATIONS ARE INTENDED TO PROVIDE POSITIVE DRAINAGE TOWARDS CATCH NOT FOR CONSTRUCTION <br /> AND/OR OUTLETS. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE REQUIRED ELEVATIONS,WHICH WILL PROMOTE POSITIVE DRAINAGE THROUGHOUT THE PROJECT SITE. <br /> LTRATION BASIN SLOPES SHALL BE SEEDED WITH NATIVE SEED MIX AND EROSION CONTROL BLANKET UNTIL TURF IS ESTABLISHED.THESE AREAS SHALL NOT BE MOWED,BUT MAINTAINED IN A MORE NATURAL STATE. <br />