Laserfiche WebLink
Case #P 18-09 Dickenson Addition simple plat <br /> 1. No concerns or issues with the application as proposed. <br /> Case #CU 18-13 Tammy Anderson CUP <br /> 1. No concerns or issues with the application as proposed. <br /> Case #18-04 Danielle Scharber—site plan review retaining wall/fence/pool <br /> 1. No concerns or issues with the application as proposed. <br /> Case #P 18-12 <br /> CU 18-15 <br /> EV 18-05 <br /> ZC 18-05 River Walk Apartments / Storage Units <br /> 1. Submit full stormwater management plan write up,must meet all city stormwater <br /> ordinances. <br /> 2. MnDNR will follow up with comments regarding requirements for state floodplain <br /> and the Mississippi River Wild and Scenic and Recreational requirements. <br /> 3. Show all proposed grades in dark solid lines. <br /> 4. Show parking lot contours, direction of flow and grade percentages. <br /> 5. Submit soil borings and infiltrometer tests for all proposed infiltration basin areas. <br /> 6. Existing basin nearest the floodway at the Saxon Building needs to be shown <br /> accurately with a noted boundary. <br /> 7. Show capacity and overflow elevations of the Saxon Building stormwater basin. <br /> 8. Show and label all EOF locations and flow paths. <br /> 9. Where does the low point of the GFE drain to? <br /> 10. Submit full SWPPP with all required details. <br /> 11. Update all rates for each drainage area and show the rates for each drainage area in a <br /> table. Currently rate control is not being met. <br /> 12. Bold all existing storm lines so they are visible or denote with something that is <br /> visible. <br /> 13. Show tree clearing limits as well as the other side of the trees. <br /> 14. Submit pipe sizing table. <br /> 15. Where is the roof drainage directed to? <br /> 16. Submit full MIDS report. <br /> 17. CB#4 would not capture much drainage in the drive lane. <br /> 18. Show all pre-treatment for each infiltration basin. <br /> 19. Submit long term maintenance plan for all BMPS. <br /> 20. Construction can't commence until a NPDES Permit is issued. <br /> 21. Staff reserves the right to continue review of all site,grading and utility plans. <br /> N:\Departments\Community Development\Planning\Case Files\P\P 18-10 Monroe Estates Preliminary Plat\4-Planning <br /> Commission\at\UPDATED STorrnwater Site Plan Review Memo 8-10-2018.docx <br />