My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-02-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
05/02/2005
>
5.4. SR 05-02-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:56 AM
Creation date
4/29/2005 9:27:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/2/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />East Elk River Elementary School/m 05-08 <br />April 21, 2005 <br /> <br />Page 3 <br /> <br />. The pavement grades in the area of the service dock do not appear to provide <br />positive drainage. Additionally, should the single storm sewer inlet become blocked, <br />storm water will rise to an elevation of 33.0 to reach another inlet. Consideration <br />should be given to adding an additional storm sewer inlet in this area. <br /> <br />. The depression in the west parking area is shown to be 1.7 feet below the pavement. <br />Does this area need to be depressed this much? If so, change the width of this <br />depression to flatten the side slopes. Will this area be surrounded by concrete curb? <br />If so, include a curb opening and spillway to direct drainage to the inlet. <br /> <br />. The plan needs to include top of wall and bottom of wall elevations. for the retaining <br />wall near the existing wetland on the east side of the project. <br /> <br />. The plan needs to show NWL and HWL for the wetland area. <br /> <br />C. Sheet C1.55 <br /> <br />. The site is over one acre of disturbed. area and therefore, will require an NPD ES <br />permit. It may be better for the School District site to apply for their own NPDES <br />permit, rather than try to operate under the NPD ES permit for the River Park <br />development, since beyond potentially rough grading of this site, it will be two <br />separate contractors. Along with the NPDES permit and Storm Water Pollution <br />Prevention Plan (SWPPP) needs to be prepared and signed by the contractor, owner, <br />designer, and two executed copies provided to the City. The City has prepared a <br />generic SWPPP which can be utilized by this project. <br /> <br />. The pond slopes must be stabilized with erosion control blanket immediately <br />following completion of the grading of these areas. <br /> <br />. Due to the area of the project, temporary sedimentation basins are required and <br />should be incorporated where appropriate. <br /> <br />. The rock construction entrance is shown on a driveway connecting to a road that <br />may not be existing at the time of construction. An alternate access point may need <br />to be identified. <br /> <br />D. Sheet C1.6 <br /> <br />· Sanitaty sewer designs need to include proposed elevations. <br /> <br />· The sanitary sewer and storm sewer on the site will be considered private, however <br />the watennain will be considered public, since it includes hydrants for fire fighting <br />purposes. Drainage and utility easements need to be provided around the site, <br />encompassing the water system. <br /> <br />. The eight-inch watermain connection shown in the south driveway should include an <br />eight-inch valve. <br /> <br />S:\PLANNlNG\Case Files \200S\CU 05-08 Anderson-] ohnson \04 21 05 engrs memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.