My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 09-11-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
09-11-2018
>
5.3 ERMUSR 09-11-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:45:58 AM
Creation date
9/7/2018 2:58:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The coating Dry Film Thickness (DFT) on the exterior varies from 5.5 to 28.3 mils with <br /> an average of 18.5 mils DFT. <br /> 3.9 Site and 3.9.1 <br /> Environmental No recommendations are made. <br /> Considerations <br /> In conformance with Minnesota State Rules Chapter 7025 and Federal USEPA Rules <br /> for air quality and control of dust and fugitive emissions, a risk factor analysis has <br /> been performed to determine the class of pollution control required for the tower <br /> during reconditioning.The risk factor is a calculation of potential risk for the structure <br /> and the values in the table of Subpart 3 (of the standard) are the standards of the risk <br /> factor for the surrounding properties. The class of pollution control required for <br /> compliance with the rules is Class H,which requires full containment. <br /> 3.10 Antenna 3.10.1 <br /> Considerations There is two (2) City owned whip antennas located on the tower, and twelve (12) <br /> cellular antennas. See photos 51, 52, 53 and 54. <br /> During the next scheduled reconditioning the Telecommunication Companies will <br /> have to relocate their antennas and equipment to temporary facilities. After <br /> reconditioning the should relocate their equipment back in the tower and onto the <br /> new roof hand-railing. The cost of this shall be their responsibility and not charged <br /> back to the City. <br /> 10 <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.