Laserfiche WebLink
Code Related Cost Items Unit Cost Units <br />Unit <br />Quantity Total <br />Roof Construction <br />-$ <br />Mechanical- Electrical <br />Mechanical <br />Install code compliant HVAC system 17.35$ SF 1900 32,965.00$ <br />Electrical <br />Install code compliant electrical wiring 8.72$ SF 1900 16,568.00$ <br />Total Code Improvements 119,479$ <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 2 of 2 <br />Code Deficiency Cost Report <br />Parcel U, Pizzeria and Bakery