Laserfiche WebLink
Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />Replacement Cost Report <br />Square Foot Cost Estimate Report Date:6/26/2018 <br />315 Jackson Ave NW <br />City of Elk River <br />315 Jackson Ave NW , Elk River , Minnesota ,  <br />55330 <br />Building Type: <br />Commercial, 2 Story with Brick Veneer /  <br />Reinforced Concrete <br />Location:Elk River, MN <br />Story Count:2 <br />Story Height (L.F.):12 <br />Floor Area (S.F.):1900 <br />Labor Type:OPN <br />Basement Included:Yes  <br />Data Release:Year 2018 Quarter 2 <br />Cost Per Square Foot:$412.68  <br />Building Cost:$784,118.04  <br />% of Total Cost Per S.F. Cost <br />12.02% 45.11 85,702.11 <br />A1010 Standard Foundations 12.77 24,265.80 <br />4.42 8,389.28 <br />8.36 15,876.52 <br />A1030 Slab on Grade 2.90 5,502.58 <br />2.90 5,502.58 <br />A2010 Basement Excavation 1.95 3,697.73 <br />1.95 3,697.73 <br />A2020 Basement Walls 27.49 52,236.00 <br />27.49 52,236.00 <br />52.49% 196.91 374,137.37 <br />B1010 Floor Construction 86.53 164,411.55 <br />9.24 17,562.84 <br />2.11 4,015.87 <br />2.23 4,229.65 <br />49.13 93,349.74 <br />7.18 13,650.93 <br />8.13 15,455.35 <br />Cast‐in‐place concrete column, 12" square, tied, 200K load, 12' story  <br />height, 142 lbs/LF, 4000PSI <br />Estimate Name: <br />Costs are derived from a building model with basic components. <br />Scope differences and market conditions can cause costs to vary significantly. <br />A Substructure <br />Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing capacity 6  <br />KSF, 12" deep x 24" wide <br />Spread footings, 3000 PSI concrete, load 200K, soil bearing capacity 6 KSF,  <br />6' ‐ 0" square x 20" deep <br />Slab on grade, 4" thick, non industrial, reinforced <br />Excavate and fill, 10,000 SF, 8' deep, sand, gravel, or common earth, on  <br />site storage <br />Foundation wall, CIP, 12' wall height, pumped, .444 CY/LF, 21.59 PLF, 12"  <br />thick <br />B Shell <br />Cast‐in‐place concrete column, 12", square, tied, minimum reinforcing,  <br />150K load, 10'‐14' story height, 135 lbs/LF, 4000PSI <br />Cast‐in‐place concrete column, 16", square, tied, minimum reinforcing,  <br />300K load, 10'‐14' story height, 240 lbs/LF, 4000PSI <br />Concrete I beam, precast, 18" x 36", 790 PLF, 25' span, 6.44 KLF  <br />superimposed load <br />Flat slab, concrete, with drop panels, 6" slab/2.5" panel, 12" column,  <br />15'x15' bay, 75 PSF superimposed load, 153 PSF total load <br />Precast concrete double T beam, 2" topping, 24" deep x 8' wide, 50' span,  <br />30 PSF superimposed load, 120 PSF total load <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 1 of 4 <br />Code Deficiency Cost Report <br />Parcel U, Pizzeria and Bakery