Laserfiche WebLink
Code Related Cost Items Unit Cost Units <br />Unit <br />Quantity Total <br />Roof Construction <br />Roofing Material <br />Remove failed roofing material 0.95$ SF 3600 3,420.00$ <br />Replace roofing material to prevent water intrusion per code 9.58$ SF 3600 34,488.00$ <br />Mechanical- Electrical <br />Mechanical <br />Install code compliant HVAC system 2.53$ SF 3600 9,108.00$ <br />Electrical <br />Upgrade electrical service for new HVAC system 2.33$ SF 3600 8,388.00$ <br />Create and maintain a code required 36-inch clear space in front <br />of circuit breaker panels 100.00$ Lump 1 100.00$ <br />Total Code Improvements 123,088$ <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 2 of 2 <br />Code Deficiency Cost Report <br />Parcel T, Drug Store