Laserfiche WebLink
Code Related Cost Items Unit Cost Units <br />Unit <br />Quantity Total <br />Roof Construction <br />Roofing Material <br />Remove failed roofing material 0.95$ SF 3400 3,230.00$ <br />Install roofing material to prevent water intrusion per code 7.93$ SF 3400 26,962.00$ <br />Mechanical- Electrical <br />Mechanical <br />Install code compliant HVAC system 7.29$ SF 3400 24,786.00$ <br />Electrical <br />Provide code compliant locking device on main panel 250.00$ EA 1 250.00$ <br />Electrical wiring should be upgraded to comply with code 1.90$ SF 3400 6,460.00$ <br />Lighting should be upgraded to comply with code 8.34$ SF 3400 28,356.00$ <br />Total Code Improvements 225,658$ <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 2 of 2 <br />Code Deficiency Cost Report <br />Parcel O, Elk River Meat Market