My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 09-04-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
09-04-2018
>
4.3. SR 09-04-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:56:23 AM
Creation date
8/30/2018 10:56:04 AM
Metadata
Fields
Template:
City Government
type
CCM
date
9/4/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii <br />Standard Rate Table for 2018 <br />2018 SCHEDULE OF FEES <br />The following fee schedule is based upon <br />Hourly Billing <br />Employee Classification <br />competent, responsible professional services <br />Rates <br />and is the minimum, below which adequate <br />Sr. Principal Engineer/Surveyor$150-250/Hour <br />professional standards cannot be maintained. <br />It is, therefore, to the advantage of both <br />Sr. Project Manager - Principal Engineer/Surveyor/GIS/LA$128-195 <br />the professional and the client that fees be <br />commensurate with the service rendered. <br />Senior Transportation/Aviation Planner$125-170 <br />Charges are based on hours spent at hourly <br />Project Manager (Inc. Landscape Architect and GIS)$70-175 <br />the work. The hourly rates for principals and <br />Project/Design Engineer/Planner/Landscape Architect$65-190 <br />Licensed Surveyor/Project Surveyor$95-150 <br />rate for any individual can be provided upon <br />Specialist (Nat. Resources; GIS; Traffic; Graphics; Other)$59-156 <br />request. <br />1 <br />Senior Technician (Inc. Survey)$92-170 <br />The fee schedule shall apply for <br />the period through December 31, 2018. These <br />1 <br />Technician (Inc. Survey)$65-145 <br />rates may be adjusted annually thereafter to <br />Administrative Assistant$45-90 <br />changed overhead conditions. <br />Structural/Electrical/Mechanical/Architect$120-215 <br />These rates include labor, general business, <br />GPS/Robotic Survey EquipmentNO CHARGE <br />and other normal and customary expenses <br />associated with operating a professional <br />CAD/Computer UsageNO CHARGE <br />business. Unless otherwise agreed, the <br />Routine Office SuppliesNO CHARGE <br />above rates include vehicle and personal <br />expenses, mileage, telephone, survey stakes, <br />Routine Photo Copying/ReproductionNO CHARGE <br />charges will be made for these activities <br />Field Supplies/Survey Stakes & EquipmentNO CHARGE <br />and materials. Expenses beyond the agreed <br />MileageNO CHARGE <br />scope of services and non-routine expenses, <br />such as large quantities of prints, extra report <br />1 <br /> No separate charges will be made for GPS or robotic total stations on Bolton & Menk, <br />copies, outsourced graphics and photographic <br />Inc. survey assignments; the cost of this equipment is included in the rates for Survey <br />reproductions, document recording fees, <br />Technicians. <br />outside professional and technical assistance, <br />and other items of this general nature will be <br />invoiced separately. Rates and charges do not <br />include sales tax, if applicable. <br /> iii <br />2019 Street Improvements | Elk River, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.