Laserfiche WebLink
Code Related Cost Items Unit Cost Units <br />Unit <br />Quantity Total <br />Remove failed roofing material 0.90$ SF 5600 5,040.00$ <br />Install roofing material to prevent water intrusion per code 5.97$ SF 5600 33,432.00$ <br />Mechanical- Electrical <br />Mechanical <br />Install code compliant HVAC system 8.48$ SF 5600 47,488.00$ <br />Total Code Improvements 412,334$ <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 2 of 2 <br />Code Deficiency Cost Report <br />Parcel X, Commercial Building