My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2.b. PCSR 08-28-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
08-28-2018
>
5.2.b. PCSR 08-28-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 9:46:36 AM
Creation date
8/24/2018 9:38:10 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
beforbe <br />arethethe <br /> <br /> <br /> usedwas <br /> that <br /> laws <br />solely <br /> <br /> <br />by PAKGAJPAK <br />beshall <br />mayfiles <br /> <br /> additions <br />use the <br /> and <br /> 24610 <br /> Y <br />completion <br />project <br /> <br />not <br />report <br />unintentional 18148A <br /> files <br />for <br />indemnify <br /> <br /> DETAILS <br />for <br />07/30/18 <br /> R <br />or <br />or <br />others <br />this <br /> under <br />shallor SITE PLAN <br />approvaldrawing <br /> and <br /> <br />revisions, <br /> <br />PLANNING <br />forCADD A <br />services <br />763.424.5505 files <br /> <br /> <br />PLAN <br />supervision <br />such <br /> COVER SHEET <br />project,CADD <br />written <br /> N SHEET INDEX <br />approval, <br /> theseharmless <br />intentional <br />ELK RIVER, MN <br /> <br /> Architect <br /> CITY SUBMITTAL <br /> I <br />CADD <br /> this <br />to <br />the <br /> specificationdirect <br />All <br /> <br />making LANDSCAPE PLAN <br />www.loucksinc.com <br /> hold <br />Consultant <br />to <br />LAND SURVEYING PRELIMINARY PLAT <br />ENVIRONMENTAL <br />of <br /> <br />professional <br />ESTATES <br /> my <br />without <br /> <br />These L1-1 <br />ROGERS, MN 55374 <br />CIVIL ENGINEERING M <br /> only.plan,QUALITY CONTROL <br />thepartyshall <br />MONROE <br /> <br /> <br />I <br />SWPPP PLAN & NOTES <br />EXISTING CONDITIONS <br />deletions <br />Maple Grove, MN 55369 Consultant's <br />byLandscape <br /> <br />copiesthatthis <br /> <br />OUCKS CADD QUALIFICATION additions under L <br />othersparty SUBMITTAL/REVISIONS <br /> <br />or <br /> <br />project.GRADING & UTILITY PLAN <br />of <br /> <br /> <br />the <br />Consultantor <br />for <br /> <br /> Gregory A. Johnson - LA E <br />by that <br />reference <br />that <br /> <br />this risk <br /> <br /> <br /> <br />7200 Hemlock Lane, Suite 300 theobtain <br />me <br /> LANDSCAPE <br />L <br /> <br />preparedto <br />With PROFESSIONAL SIGNATURE Licensed R <br />andfulland <br />of <br /> <br />LANDSCAPE ARCHITECTURE <br /> to <br /> by <br />additions, <br /> certify <br />projects, <br /> <br />project <br /> the <br /> P <br />files <br />CHRISTIAN BUILDERS duly <br />& REMODELERS, INC. <br /> <br />21000 ROGERS DRIVE, SUITE 110 <br />at <br /> <br />a <br />respect <br /> <br /> <br />this <br />other <br /> deletions <br /> <br />herebyam <br /> <br />CADDwithonofConsultant.orConsultant from any & all responsibilities, claims, and liabilities.07/30/18Loucks Project No.Project LeadDrawn ByChecked ByReview Date <br />instrumentspermittedinformationrevisions,madeof the State of Minnesota.License No.Date C1-0C1-1 - C1-2C1-3 - C1-4C2-1 - C2-2C3-1 - C3-2C3-3 - C3-5C8-1L1-1 <br /> <br />IpreparedI <br />COORDINATE THE PHASES OF CONSTRUCTION AND PLANTINGAND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATEAREA.ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITIONOF THE AMERICAN STANDARD <br /> FOR NURSERY STOCK, AMERICANASSOCIATION OF NURSERYMEN. YARD AND BOULEVARD TREESSHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE FINISHEDGRADE.DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS <br /> TAKEAPPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THEAND/OR QUOTATION.ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED ASSHOWN ON PLAN. ADJUSTMENTS IN LOCATION OF PROPOSEDADJUSTMENT <br /> BE ADVISED, THE LANDSCAPE ARCHITECT MUST BEALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATIONWITH A 27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THEWITH AN APPLICATION OF GRANULAR <br /> 27-3-3 AT 6 OZ PER 2.5"CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN ADDITIONALAPPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE TREESAUCER.ALL PLANTS TO BE INSTALLED AS PER PLANTING <br /> DETAILS.WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1"GREATER IN CALIPER THAN THE TREE BEING PROTECTED ORQUALITY, HEAVY, WATERPROOF CREPE PAPER MANUFACTUREDTHE FALL PRIOR TO 12-1 <br /> AND REMOVE ALL WRAPPING AFTER 5-1.SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL)ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONSOR ANY OTHER SITE CONDITION WHICH MIGHT <br /> NEGATIVELYAFFECT PLANT ESTABLISHMENT, SURVIVAL OR GUARANTEE, HECONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THEOWNER ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITECONTRACTOR IS RESPONSIBLE <br /> FOR ON-GOING MAINTENANCEOF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNERACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICHCONTRACTOR SHALL GUARANTEE NEW PLANT MATERIALTHROUGH ONE <br /> CALENDAR YEAR FROM THE DATE OF OWNERACCEPTANCE.WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPEOF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILLTHE APPROPRIATE DATES FOR SPRING <br /> PLANT MATERIALJUNE 15, FALL PLANTING IS FROM THE FIRST FROST UNTILWRITING BY THE LANDSCAPE ARCHITECT.SATISFACTION THAT SOIL AND COMPACTION CONDITIONS AREADEQUATE TO ALLOW FOR PROPER <br /> DRAINAGE AT AND AROUNDTHE BUILDING SITE. <br />LANDSCAPE INSTALLATIONINSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADINGPLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IFPRECEDENCE OVER <br /> NOTES.NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESSLANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A BIDPLANT MATERIALS MAY BE NEEDED IN FIELD. SHOULD ANNOTIFIED.PLANTING <br /> SOIL PER THE MANUFACTURER'S INSTRUCTIONS.PLANTS MAY BE TREATED FOR SUMMER AND FALL INSTALLATIONREMOVE ALL FLAGGING AND LABELS FROM PLANTS.FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES <br /> PLANTED INMULCH SHALL BE CLEAN SHREDDED HARDWOOD MULCH WITHUNIFORM PIECE SIZE. ALL ANNUAL AND PERENNIAL BEDS TORECIEVE 3" OF MULCH WITH NO WEED BARRIER. ALL SHRUB BEDMASSINGS TO RECEIVE <br /> 3" DEEP MULCH WTH A FIBER MAT WEEDBARRIER. ALL TREES NOT IN PLANTING BEDS TO RECEIVE 4" DEEPMULCH WITH NO MULCH IN DIRECT CONTACT WITH TREE TRUNK.PER MANUFACTURER'S RECOMMENDATIONS <br /> UNDER ALLMULCHED AREAS.IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVESMUST BRING THESE DEFICIENCIES TO THE ATTENTION OF THELANDSCAPE ARCHITECT PRIOR TO PROCUREMENT AND/ORINSTALLATION.IMPROVEME <br />NTS.MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THERESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALLPROVIDE THE OWNER WITH A MAINTENANCE PROGRAMINCLUDING, BUT NOT NECESSARILY LIMITED <br /> TO, PRUNING,FERTILIZATION AND DISEASE/PEST CONTROL.MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THELANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTINGBE CONSIDERED.INSTALLATION <br /> IS FROM THE TIME GROUND HAS THAWED TONOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOTRECOMMENDED. ANY ADJUSTMENT MUST BE APPROVED INLANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS <br /> 4 4 <br />141436 <br />TOTAL <br />PROPOSED <br /> 4 436 <br />1414 <br />TOTAL <br />REQ'D <br />THE CONTRACTOR IS RESPONSIBLE FORTHROUGH THE WARRANTY PERIOD. STAKING ISAFTER PLANTING IS COMPLETE.WATER TREE THOROUGHLY DURING PLANTINGAND SATURATE SOIL WITH WATER. DO NOTTREE WRAP <br /> TO FIRST BRANCHWITH TRUNK - SEE NOTES OR SPECS.CONTRACTOR IS RESPONSIBLE FOR TESTING <br />MAINTAINING ALL TREES IN A PLUMB POSITIONSUGGESTED, BUT NOT REQUIRED. ANY STAKINGMUST CONFORM WITH PRACTICES AS DEFINEDIN A.N.A. GUIDELINES FOR STANDARDPRACTICESPRUNE DAMAGED AND CROSSING <br /> BRANCHESCUT BACK WIRE BASKETOPERATIONS. PLACE BACKFILL IN 8-12" LIFTSCOMPACT MORE THAN NECESSARY TOMAINTAIN PLUMB.ROOT FLARE EVEN WITH OR JUST ABOVE GRADE.MULCH - 4" DEEP. NO MULCH <br /> IN CONTACTBACKFILL WITH IN SITU TOPSOILEDGE VARIES - SEE PLANSCARIFY BOTTOM AND SIDES OF HOLE PRIOR TOPLANTINGSET PLANT ON UNDISTURBED NATIVE SOILPERCOLATION RATES PRIOR TO PLANTING.NOTIFY <br /> LANDSCAPE ARCHITECT IMMEDIATELY IFPOOR DRAINAGE EXISTS. <br />(2 CORNER LOTS) <br />COMMENTS <br />H 40-50' W 30-35'H 30-35' W 30-35'H 50-60' W 30-40'H 50-75' W 50'H 40-60' W 20-30'H 40-50' W 30-35' <br />SIZE <br />2-1/2" CAL B.B.2-1/2" CAL B.B.2-1/2" CAL B.B.2-1/2" CAL B.B.2-1/2" CAL B.B.2-1/2" CAL B.B. <br />DECIDUOUS TREE PLANTING DETAIL SCALE: 1/2" = 1'-0" <br />GENERAL NOTESCONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALLVERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THEATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIESWHICH <br /> MAY COMPROMISE THE DESIGN AND/OR INTENT OF THEASSURE COMPLIANCE WITH ALL APPLICABLE CODES ANDCONTRACTOR SHALL PROTECT ALL EXISTING ROADS,CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE <br /> ELEMENTS DURINGAT NO COST TO THE OWNER.CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL <br />INSPECT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONSRELATING TO THE NATURE AND SCOPE OF WORK.PROJECT'S LAYOUT.REGULATIONS GOVERNING THE WORK OR MATERIALS SUPPLIED.PLANTING OPERATIONS. <br /> ANY DAMAGE TO SAME SHALL BE REPAIREDUNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THENECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION /MATERIAL INSTALLATION BEGINS (MINIMUM 10' <br /> - 0" CLEARANCE). <br />YARD TREES - 1 PER LOT (14 LOTS)YARD TREES - 2 PER CORNER LOT (2 CORNER LOTS)TOTAL TREESYARD TREES WILL BE PLANTED AT TIME OF BUILDING CONSTRUCTION. <br />BOULEVARD TREES - 1 PER LOT (14 LOTS)BOULEVARD TREES - 2 PER CORNER LOTBOULEVARD TREES ALONG MONROE ST. NW ARE LOCATED ON THE BUILDING LOTSDUE TO A WIDENED ROAD SURFACE, SWALE AND <br /> UTILITIES IN THE ROW.BOULEVARD TREES WILL BE PLANTED AT TIME OF ROAD AND CURB INSTALLATION, <br />TREE PLANTING REQUIREMENTS <br />BOULEVARD TREE NOTES <br />N <br />SCIENTIFIC NAMETilia cordata 'Greenspire'Gleditsia triacanthos inermis 'Impcole'Ulmus carpinifolia 'New Horizon'Celtis occidentalisPopulus tremuloidesQuercus ellipsoidalis <br />COMMON NAMEGREENSPIRE LINDENIMPERIAL HONEYLOCUSTNEW HORIZON ELMCOMMON HACKBERRYQUAKING ASPENRED OAK <br />BOULEVARD TREES - 18 TOTALYARD TREES - 18 TOTAL <br />836558 <br />QTY <br />IHQA <br />CHNHCHRO <br />KEY <br />PLANT LIST <br />YARD TREES <br />BOULEVARD TREES <br />LANDSCAPE LEGEND <br />Gopher State One Call <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES INMAINTAINING THEIR SERVICE AND / OR RELOCATION <br /> OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUNDWIRES, CABLES, CONDUITS, PIPES, MANHOLES, <br /> VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACETHE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THEOWNER. <br />WARNING: <br />07 /30 / 2018 10:22 AMPlotted: <br />W:\\2018\\18148A\\CADD DATA\\LANDSCAPE\\_dwg Sheet Files\\18148A-Landscape Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.