My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 08-28-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
08-28-2018
>
5.3. PCSR 08-28-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 8:45:25 AM
Creation date
8/24/2018 8:21:25 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.Show and label all EOF locations and flow paths. <br />8.Identify where low point of the GFE drains. <br />9.Submit full SWPPP with all required details. <br />10.Submit full MIDS report. <br />11.Update all rates for each drainage area and show the rates for each drainage area in a table. <br />Currently rate control is not being met. <br />12.Bold all existing storm lines so they are visible or denote with something that is visible. <br />13.Submit pipe sizing table for all storm sewer lines. <br />14.Where is the roof drainage directed? <br />15.CB#4 would not capture much drainage in the drive lane. <br />16.Show all pre-treatment for each infiltration basin. <br />17.Submit long term maintenance plan for all BMPS. <br />18.Construction cannot commence until an NPDES Permit is issued. <br />19.Staff reserves the right to continue review of all site, grading and utility plans. <br />Environmental: <br />1.MnDNR will follow up with comments regarding requirements for state floodplain and the <br />Mississippi River Wild and Scenic and Recreational requirements. <br />2.Section 30-2022 requires a 30 foot setback from the top-of-bluff. Move structures outside of <br />the setback. <br />3.Submitted plans showing the hardcover calculations. Sketches indicate the area inside the <br />building, courtyard, will have impervious surfaces. <br />a.If land along the river is dedicated for park use, the hardcover calculations will change. <br />Updated plans will be required based on park recommendations. <br />4.Staff reserves the right to continue review of all site, grading and utility plans. <br /> <br />Any additional comments provided by MnDOT or MnDNR will need to be addressed at that time. <br />Unaddressed comments will be included as conditions for approval. Staff reserves the right to <br />continue review of all site, grading and utility plans <br /> <br />Thank you, and please let me know if you have any questions. <br /> <br />Sincerely, <br /> <br />Zack Carlton, Planning Manager <br />763.635.1035 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.