Laserfiche WebLink
A representative from MMPA will be presenting to the Elk River Rotary on July 12 <br /> regarding the Clean Energy Choice program. Staff has met with representatives of <br /> MMPA regarding the implementation of this program. <br /> • On August 6 I participated in a Moody's bond rating call with Theresa Slominski, Lori <br /> Ziemer—City of Elk River Finance Director, and Terri Heaton— Springsted. The call is <br /> in preparation to bond sales for the second part of ERMU's MMPA buy-in. A few notes <br /> of importance from the call: <br /> o This is not a new expense, but rather a replacement for an existing expense. <br /> Therefore it doesn't result in an increase to rates. And the bigger ERMU gets <br /> through growth, the bigger the savings between Great River Energy (GRE) and <br /> MMPA. <br /> o The bonds are not general obligation; they are electric revenue bonds which do <br /> not impact the city or their ability to issue debt. <br /> o There's a"net revenues available for debt service" test that requires 1.25 time <br /> coverage. ERMU greatly exceeds that requirement with 5.12 times coverage. <br /> o Being designated as an American Public Power Association (APPA) Reliable <br /> Public Power Provider (RP3) utility was noted as being extremely positive from <br /> Moody's. They know APPA and the RP3 program well. <br /> o ERMU's growth and the City of Elk River's growth were noted as positives. <br /> o MMPA's recent rating upgrade from Fitch and from Moody's was noted. <br /> Moody's is going to have their MMPA analyst sit on the committee for ERMU's <br /> rating review; this is a good thing for us. <br /> Moody's will do their review the week of August 13 and provide their report the week of <br /> August 20. <br /> • Over the past month I have spent significant time working on Wage & Benefit <br /> Committee preparation and hiring. <br /> • I attended the Minnesota Municipal Utilities Association (MMUA) board meeting at their <br /> new office in St.Paul to review the draft 2018/2019 budget and the report from the cost <br /> of service initiative. <br /> • The MMUA Summer Conference is August 20-22 in Alexandria, MN. I will be <br /> presenting with John Miner on governance policy. I will officially roll off the MMUA <br /> board after the business meeting at the end of this conference. <br /> • The MMUA Technical & Operations Conference will be December 4-6 in St. Cloud. I <br /> will be presenting on a panel about employee retention and wages. <br /> • On July 6 ERMU, MMPA and GRE held another wholesale power migration conference <br /> call. Most items regarding the transition are resolved in either concept or implementation. <br /> A few remaining issues include the electric service GRE utilized from ERMU Substation <br /> 14 Bank 3 and issues/considerations regarding the fate of the GRE Energy Station <br /> generation facility and related facilities. <br /> There is a Joint Pricing Zone (JPZ) agreement which needed to be modified to reflect <br /> ERMU's transition to MMPA. This JPZ provides for transmission Midcontinent <br /> Page 2 of 3 <br /> 66 <br />