My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 12-13-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
12-13-2005
>
5.3 ERMUSR 12-13-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:10:24 PM
Creation date
8/6/2018 12:08:32 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> Non-Demand Electric Service <br /> Summer: , <br /> The summer rate shall apply to the Customer s use from May 1 through September 30 <br /> Winter: <br /> The winter rate shall apply to the Customer's use from October 1 through April 30 <br /> Minimum Bill: The Account Maintenance Charge plus $1 00 per kVA per month of <br /> excess transformer capacity requested by customer ' <br /> In case of equipment having abnormally low annual utilization factors or unusual operating <br /> characteristics, special minimum charges may be prescribed by Elk River Municipal <br /> Utilities <br /> Power Factor Adjustment: The rates set forth in this schedule are based on the <br /> maintenance by the Customer of a power factor of not less than 95% at all times If the <br /> power factor, as measured by the electric department, is lower than 95%, the monthly <br /> demand charge will be multiplied by the ratio 95% to the measured power factor, or at Elk <br /> River Municipal Utilities' option, the power factor may be corrected at the Customer's <br /> expense <br /> Fluctuating Loads: Customers operating equipment having a highly fluctuating or large <br /> instantaneous demand, such as welders and X-ray machines, shall be required to pay all <br /> non-betterment costs of isolating the load from the balance of Elk River Municipal Utilities' <br /> lines In addition, Customers who fail to provide adequate corrective equipment shall be <br /> required to own and maintain their own transformers No motor larger than ten (10) HP <br /> will be allowed to be across-the-line started without notification and written authorizationell <br /> from Elk River Municipal Utilities <br /> Terms Of Payment: Bills are due and payable upon receipt and delinquent if not paid by <br /> the due date noted on the bill There will be a ten (10) percent late payment charge added <br /> to all accounts that are not paid by the due date <br /> Terms And Condition: <br /> 1 Usage may be fractionalized on the actual days of service for application of a <br /> change in rate or changing from summer to winter or from winter to summer rates <br /> 2 Service will be furnished under the Elk River Municipal Utilities' rules <br /> 3 Extensions made for service under this schedule are subject to the provisions of Elk <br /> River Municipal Utilities' rules governing Extension of Service and Facilities <br /> 4 The rate set forth herein may be modified by the amount of any governmental <br /> changes imposed and levied on transmission, distribution, production, or the sale of <br /> electrical power <br /> Installation Of Demand Meter: At the option of Elk River Municipal Utilities, a demand <br /> meter may be installed on any customer whose (1) monthly usage exceeds 15,000 kWh <br /> Approved r! Adopted December 13, 2004 <br /> Effective January 1, 2005 <br /> 111• <br />
The URL can be used to link to this page
Your browser does not support the video tag.