Laserfiche WebLink
I <br /> (b) Emergency Power. Emergency power service to the Project with 500 <br /> kilowatt, 600 amps, 3 phase, 4 wire, 480 volt service. This service will be <br /> available as of November 13, 2006. <br /> (c) New Primary Feed. A Primary Feed for power of 10.3 megawatts, 500 <br /> Iamps, 3 phase, 3 wire, 12,460 volt service. Municipal Utility will use its best <br /> efforts to provide the new Primary as soon as possible, but no later than <br /> November 13, 2006. The approximate location of the new Primary Feed is <br /> Idepicted on Exhibit B attached hereto. <br /> I 2. Down Time. Although Municipal Utility will use its best efforts to ensure <br /> the continuous operation of the new Primary Feed, Target acknowledges that supplying <br /> the Project with power from a single Primary Feed creates a risk that a substation failure, <br /> Icut line or other problem with the Primary Feed could result in Municipal Utilities <br /> inability to supply the desired 10.3 megawatts of power for an extended time. During any <br /> I time that the Primary Feed is down, Municipal Utility will only be able to supply <br /> approximately 2 megawatts of power to the Project from Municipal Utilities existing <br /> power system. Target acknowledges and accepts the risk of down time in the Primary <br /> I Feed and releases Municipal Utility from any claims arising from such down time except <br /> to the extent that Target would have such a claim under applicable law independent of <br /> this Agreement at law or in equity. <br /> RP <br /> 3. Cancellation Fees. Target acknowledges that Municipal Utility must order <br /> I the necessary equipment for the new Primary Feed and substation equipment <br /> immediately, and hereby agrees that if Target fails to construct the Project, then Target <br /> shall be responsible for the payment of fees actually incurred by Municipal Utility for <br /> I cancellation of those orders up to a maximum amount of One Hundred Fifty Thousand <br /> and No/100 Dollars ($150,000.00). <br /> I4. Cost of Electric Charges. Target and Municipal Utility hereby agree that <br /> Target shall pay for Electric Power as follows ("Electric Charges"): <br /> I (a) Commercial/Industrial Rates. Target shall pay the <br /> "Commercial/Industrial" rates as promulgated from time to time by <br /> I Municipal Utility in accordance with all applicable laws and regulations, <br /> with the exception set forth in Section 4(b) below. The current <br /> "Commercial/Industrial" rates are set forth on Exhibit C attached hereto. <br /> (b) Most Favored Nation. Municipal Utility agrees that Target shall not be <br /> I required to pay Electric Charges at a higher rate than that paid or which <br /> would be payable by any other customer of Municipal Utility, with the <br /> following exceptions: <br /> I <br />