My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 ERMUSR 11-09-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
11-09-2005
>
5.4 ERMUSR 11-09-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:11:42 PM
Creation date
8/6/2018 11:11:35 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Ill <br /> Elk River Municipal Utilities <br /> 2006 Water Distribution & Electronic Technologies Capital Projects <br /> IWater Department Capital Projects <br /> I1. $30,000 Paint or remove Jackson St Water Tower (Delay) <br /> 2. $80,000 Loop water main on Co Rd 30 for Target expansion <br /> I3. $75,000 Loop water main at 175 Av to improve Johnson St Water Tower <br /> 4. $20,000 Pull, Inspect and repair Well #4 <br /> 1 5. $18,000 Pull, Inspect and repair Well #6 <br /> 6. $120,000 Continue ASR study for well #2 <br /> I7. $9,000 Purchase and install Oil-less air compressors for wells 4,5,6,7 <br /> 8. $42,000 Purchase Portable Vac-Tron Valve Exerciser <br /> 1 9. $40,000 Purchase another portable 250 KW generator (Delay) <br /> 10. $30,000 Purchase and install automatic switchgear to operate generators <br /> Ito peak shave electric load. <br /> 11. $12,000 Loop dead end main at Guarding Angles (Delay) <br /> 11. 12. $3,000 Electrically inspect all well & treatment plants for potential <br /> failures. <br /> 1 13. $10,000 Pick-up truck for summer help. (Additional to Fire Truck) <br /> 14. $15,000 Miscellaneous Repairs <br /> $422,000 <br /> i <br /> Electronic Technologies Department Capital Projects <br /> I1. $5,000 New Computer for Meter shop <br /> 2. $2,500 Tent for Meter shop <br /> 1 3. $60,000 Pick-up for new supervisor& locator/CAD operator <br /> 4. $30,000 Computer& Software for 2 new employees <br /> 110 $97,500 Total <br /> I <br /> I <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.