My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMU Misc. 09-13-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
09-13-2005
>
ERMU Misc. 09-13-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:13:56 PM
Creation date
8/6/2018 10:50:05 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-15-2005 02:5TPM FROM-ERMU + T-276 P.002/005 F-039 <br /> • Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> September 13,2005 <br /> Dave Berg responded that summer help is finished. Next year we will need 4 people to flush <br /> hydrants in a shorter period of time. They are starting to modify well#8 to increase operating <br /> efficiencies. 12 security systems were sold with 26 contacts being made. <br /> Theresa Slominski reported that the Power Manager Users Group seminar was this week. <br /> Budgets are in full swing. The new front clerk starts 9/19/05 and Judy will be out due to <br /> medical leave until 9/22/05. <br /> 5.2 69KV Transformer Bid <br /> Bids were received for one 69KV Translbmmer for the West Substation Upgrade, and an <br /> option to purchase a second identical Transformer for the substation 14 Upgrade Project to <br /> service the proposed Target facility. Two bids were received and staff recommended the <br /> Waukesha Transformer bid with a resistance LTC at a cost of$403,350. <br /> Jim Tralle motioned to accept Waukesha Transformer bid and John Dietz seconded. <br /> Motion carried 3-0. <br /> • 5.3 Target Date Center Facility <br /> Providing that ERMU receives the go ahead for the Target Data Center on September 15 <br /> 2005,the following items were proposed to proceed: <br /> 1) Award contract to purchase another 15MVA substation transformer <br /> 2) Award engineering contract to USG for$20,000 to design substation <br /> expansion for Station 14. The physical expansion costs are in the$300,000 <br /> range. <br /> 3) Award engineering contract to USG for approximately$15,000 for drafting <br /> service to produce construction drawings for the two required feeders. <br /> 4) Secure bids and award contract for 120,000 LF Of 1000 KCMIL aluminum <br /> URD conductor. Approximate cost is$720,000. Specifications are completed <br /> and ready for advertising. This will be awarded at the October commission <br /> meeting. <br /> John Dietz motioned and Jim Tralle seconded directing staff to proceed upon <br /> notification from Target/Ryan. Discussions were held concerning possible cancellation <br /> charges of material ordered if Target backs out of project. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.