Laserfiche WebLink
I <br /> 4. Provide City a 42' wide easement on north side of property for <br /> future CSAH 39 road expansion. 4111/1 <br /> 5. Paint or replace existing metal meter building (owned by Wright I <br /> Hennepin Co-op). <br /> 6. No over night storage of vehicles. I <br /> Attached is a plan view of the proposed expansion. With the City of Otsego action, we <br /> I <br /> can now proceed with this substation expansion. In a complicating but expected issue, <br /> condition 2 above will require us to bury the existing overhead line on the north side of <br /> CSAH 39. This will be an added cost. We will also need to construct feeders from this <br /> I <br /> substation as well. <br /> I <br /> I <br /> I <br /> N <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> • <br /> 1 <br /> lit <br /> 1 <br />