My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 08-16-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
08-16-2005
>
5.2 ERMUSR 08-16-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 1:20:07 PM
Creation date
8/6/2018 10:39:45 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> ' Municipal Utilities <br /> 13069 Orono Parkway phone: 763.441.2020 <br /> Elk River,MN 55330 Fax 763 4418099 <br /> ' Mr. Dave Kempf 7-19-05 <br /> Great River Energy <br /> ' P.O. Box 800 <br /> Elk River MN 55330 <br /> ' Subject: Distribution Substation Expansion <br /> Station #14 <br /> ' Dear Dave: <br /> This letter is confirming our conversation on 7-18-05 with you, Cassie Polman, Jerry <br /> t Takle, and me concerning the possible expansion of a distribution substation at station <br /> #14. The Elk River Municipal Utilities (ERMU) has a large electric use customer desiring <br /> to locate in Elk River. This customer desires a source of electric feed from two different <br /> Ile substations. Our analysis indicated that expanding station #14 with another 69KV / 12.47 <br /> KV transformer on the east 69KV bus is the best solution. All agrees to move in this <br /> direction with GRE's full support and approval. <br /> ' GRE is upgrading this substation in the late 2005 to mid 2006 time frame. GRE will <br /> incorporate a 600 amp minimum 69 KV switch at the north end of the east 69 KV bus. <br /> ERMU using USG as their engineers will design, purchase the necessary materials, and <br /> construct the distribution substation which will be operational by fall of 2006. USG will <br /> coordinate their work with your engineers. <br /> 1 If you have any questions about the above, do not hesitate to call. <br /> ' Best re rds; <br /> Brya Adams, PE <br /> General Manager <br /> cc: File <br /> Glenn <br /> Jerry Takle <br />
The URL can be used to link to this page
Your browser does not support the video tag.