My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.3. SR 08-06-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
08-06-2018
>
10.3. SR 08-06-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2018 10:20:53 AM
Creation date
8/3/2018 10:50:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/6/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(ESTIMATE DATE: <br />August 6, 2018 <br />PROJECT: <br />Elk River Senior Center - Remodel Option <br />ARCHITECT: <br />292 Design Group <br />DRAWING DATE: <br />August 1, 2018 <br />Building Permit <br />$28,840 <br />$2.79 <br />Bond/Sub Bonds <br />$21,048 <br />$2.04 <br />subtotal Construction Costs <br />$2,004,780 <br />$193,94 <br />Escalation <br />3.00% <br />$60,143 <br />$5.82 <br />Design Contingency <br />5.00% <br />$103,246 <br />$9.99 <br />Construction Contingency <br />5.00% <br />$103,246 <br />$9.99 <br />Contractor's Fee <br />2.95%1 <br />$63,961 1 <br />$6.19 <br />Architectural Fees <br />7.50% <br />$175,153 <br />$16.94 <br />Furniture, Fixtures, & Equipment <br />$50,000 <br />$4.84 <br />Total Construction Estimate <br />$2,560,531 <br />$247.71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.