My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-06-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
08-06-2018
>
4.7. SR 08-06-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 10:56:03 AM
Creation date
8/2/2018 10:55:04 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/6/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monday-Friday 7:00 AM until 9:00 PM <br /> Saturday 8:00 AM until 5:00 PM (only with 48 hour advance notice to the <br /> City Engineer or their representatives) <br /> Sunday Not Allowed <br /> This does not apply to activities that are required on a 24-hour basis such as dewatering, etc. Any <br /> deviation from the above hours is subject to approval of the City Council. <br /> (04) Street Construction. No street construction will be allowed after October 15 or prior to <br /> May 15 unless approved by the City Engineer. <br /> (05) Snowplowing. Until the Improvements are accepted by the City or an agreement expressly <br /> reached in advance, the developer is responsible for snow removal and ensuring access by <br /> Emergency Response equipment. <br /> (06) Mailboxes. All mailboxes be clustered, and in a style and location acceptable to the City of <br /> Elk River. <br /> (07) Historv. Any item or condition found that indicates the site is likely to yield information <br /> important to pre-history or history shall be reported to the city immediately, and the city reserves the <br /> right in such event, to stop work immediately until the subdivision is appropriately investigated and <br /> developer is authorized to recommence work. <br /> 11. Park Dedication. Developer shall satisfy park dedication requirements through a cash <br /> donation equal to the low-density Park Dedication fee identified in the city's fee schedule at the time of Final <br /> Plat recording. The current amount is Fifty Seven Thousand, Thirty Seven and 20/100 dollars ($57,037.20), <br /> ($1,425.93 per lot). <br /> 12. Development Plan. A development plan "Development Plan" shall be submitted by <br /> Developer and approved by the City Engineer or his designee prior to issuance of any building permit within <br /> the Subdivision. The Development Plan will identify, for each lot in the Subdivision those items noted on <br /> the checklist attached as Exhibit E to this Agreement. Approval of the Development Plan may be contingent <br /> upon soil borings verifying elevations and compaction tests for proposed house pads. <br /> 13. Landscaping. Developer shall cause the homebuilder to install two over story (deciduous) <br /> trees in the boulevard of each Lot. All required trees shall be 2 inches in caliper. <br /> (01) All residential landscaping requirements shall be completed prior to occupancy of the <br /> dwelling unit, or by June 1 following occupancy if occupancy occurs October 15 through May 31. <br /> (02) In the event the landscaping,including trees and establishment of turf,is not complete at the <br /> time of Certificate of Occupancy, the City may issue a certificate of occupancy and require the <br /> provision of a cash deposit from the builder of the lot to guarantee the successful completion of the <br /> landscaping improvement. The cash deposit shall be no less than $1,000.00. The City,its employees, <br /> agents or contractors shall have the right to go upon the property to complete the landscaping <br /> without permission of the owner of the property or lot, and shall not be liable for trespass. The City <br /> may also require a deposit as part of the building permit fee to secure compliance with the <br /> landscaping requirements. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.