My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-1991 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
1990-1999
>
1991
>
08-12-1991 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 1:54:32 PM
Creation date
7/25/2018 1:54:32 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
8/12/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9) The General Manager reviewed the June and July financial <br /> statements with the Commissioners with particular emphasis being <br /> placed on the high demands which occurred during those two months <br /> which caused the purchased power costs to be abnormally high, thus <br /> reducing the operating margins. <br /> 10) The General Manager reported the Public Utilities Commission has <br /> accepted the agreement worked out with Anoka Electric Cooperative. <br /> ERMU staff has since met with AEC and the first definition of <br /> territory acquisition has occurred. AEC has up to a year to <br /> respond with costs. <br /> 11) A report depicting the needs for a future substation was <br /> presented. The Commission directed staff to proceed with the <br /> proper planning for this future addition. <br /> 12) The next meeting was set for Monday September 9, 1991 at 4 : 00 P.M. <br /> at the Utilities Office. <br /> 13) Motion by Mr. Zabee, seconded by Mr. Tralle to adjourn. The <br /> motion carried. Meeting adjourned at 5:45 P.M. <br /> Bill Birrenkott <br /> General Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.