My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-1994 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
1990-1999
>
1994
>
08-09-1994 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 8:46:06 AM
Creation date
7/25/2018 8:46:05 AM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
8/9/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> 4"4322 King Avenue <br /> Elk River, Minnesota 55330 <br /> Phone (612) 441-2020 <br /> UTILITIES COMMISSION MINUTES <br /> August 9, 1994 <br /> 3:00 P.M. <br /> Present Were: James Simpson President <br /> George Zabee Vice Chairman <br /> James Tralle Trustee <br /> Others Present: Bill Birrenkott General Manager <br /> Glenn Sundeen Line Superintendent <br /> Terry Maurer City Engineer <br /> 1) The meeting was called to order at 3 :00 P.M. by President <br /> Simpson. <br /> 2 ) Motion by Mr. Zabee, seconded by Mr. Tralle to approve the <br /> agenda as amended. The Motion carried. <br /> 3) Motion by Mr. Zabee, seconded by Mr. Tralle to approve the <br /> minutes of the previous meeting as distributed. The motion <br /> carried. <br /> 4 ) Terry Maurer, City Engineer, reported that their latest models <br /> indicated that the size of the future water tower at the Gary <br /> Street location should be one million gallons in capacity. If <br /> sewer and water is extended East, a water tower will not be <br /> needed for 20 years in that area, in Terry's opinion. Terry <br /> further stated that the Utilities should plan on constructing <br /> a 500,000 gallon tower in the Northwest area in 1999 to <br /> supplement the high pressure zone. Motion by Mr. Tralle, <br /> seconded by Mr. Zabee to authorize MSA to proceed with the <br /> design and prepare bids for a one million gallon water tower <br /> at the Gary Street location. The motion carried. <br /> 5) With the information supplied by the City Engineer, the General <br /> Manager presented several scenarios for future funding of water <br /> towers, wells and treatment plants considering the availability <br /> of the possible $380,000 for water tower construction as <br /> indicated by previous City Councils. Several scenarios were <br /> also presented by the General Manager without the availability <br /> of the $380, 000 . The Commission decided to take no action at <br /> this time. <br /> 6) The Line Superintendent updated the Commissioners on the status <br /> of construction projects and other operating conditions. <br /> 7) The General Manager reviewed the July financial statements with <br /> the Commissioners. <br />
The URL can be used to link to this page
Your browser does not support the video tag.