My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-1998 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
1990-1999
>
1998
>
05-19-1998 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 11:00:28 AM
Creation date
7/24/2018 11:00:28 AM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
5/19/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> May 19, 1998 <br /> John Dietz moved to use Municipal Utility funds to finance the remainder of costs, <br /> not covered by assessments, for the construction of watermain for the Orono Lake <br /> Development. George Zabee seconded the motion. Motion carried 2-0. <br /> 6.1 Review and adopt side lot easement requirement <br /> The Water Department has a requirement to loop watermains, to ensure good water <br /> water quality and increase fire flow. Many new developments utilize cul-de-sacs, <br /> requiring the looped water mains to be located in side lot easements. Current set- <br /> back requirements are 5' feet from property line on garage side and 10' feet from <br /> property line on house side. These requirements do not allow enough distance <br /> between the water main and the house if a main should break. The result would be <br /> substantial damage to the house or structure. <br /> George Zabee moved to adopt a 40' easement, to ensure that no structure would be <br /> built closer than 20' from the water main. John Dietz seconded the motion. Motion <br /> carried 2-0. <br /> Staff is directed to write a memo to City Council advising the change. <br /> 6.2 Review Inspection Report for Freeport Water Tower <br /> The report of inspection of the Freeport Water Tower by KLM Engineering, Inc. <br /> was reviewed and discussed. Time frames for repairs and maintenance to the <br /> Tower were analyzed. Bryan Adams advised that it would take approximately ten <br /> weeks to do the job, with these repairs lasting approximately fifteen years. <br /> Specifications will be written this fall, for work to be done in the spring of 1999. <br /> John Dietz moved to receive and file the inspection report. George Zabee seconded <br /> the motion. Motion carried 2-0. <br /> Further discussion took place regarding the need for inspection of the Gary Street <br /> Tower. <br /> Other Business <br /> John Dietz questioned the necessity of starting the re-locating of poles on School Street <br /> before the City has the easements from the School District. Staff is directed to check <br /> with the City and the City Engineer before moving poles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.