My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1998 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
1990-1999
>
1998
>
02-10-1998 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 10:53:20 AM
Creation date
7/24/2018 10:53:19 AM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
2/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> February 10, 1998 <br /> 5.6 Review and consider ERMU purchasing policy <br /> George Zabee moved to adopt the Purchasing Policy for the Elk River Municipal <br /> Utilities as follows: Elk River Municipal Utilities Staff shall have the authority to <br /> purchase the necessary equipment and materials to ensure an efficient running <br /> organization without prior commission approval, except for the following: <br /> a. Purchases that require a formal billing process (currently any purchase <br /> greater than$25,000.00). <br /> b. Any non-budgeted item in excess of$10,000.00. <br /> c. Any new vehicle purchase. <br /> Competitive prices,where possible, shall be secured for all purchases, with at least <br /> two quotes for items over$5,000.00. <br /> John Dietz seconded the motion. Motion carried 2-0. <br /> 5.7 Wind Power& Methane Gas Generation Up-date <br /> Bryan Adams advised the Commission that the letter of intent between ERMU and <br /> Power Strategies for methane gas generation at the landfill has been executed and the <br /> final power purchase agreement is currently being negotiated. This final agreement <br /> will need approval from AEC,UPA, and this Commission. Northern Alternative <br /> Energy has made a proposal to ERMU,AEC, and UPA concerning wind powered <br /> generation at the landfill. UPA and AEC are currently studying this proposal. UPA <br /> and AEC must act on this proposal before bringing it to this Commission. <br /> 5.8 Water Well Maintenance <br /> Robert McCartney reported to the Commission on the success of the inspection and <br /> repairs of Well#2. The pump was repaired,the line shaft and column pipe replaced <br /> and the motor refurbished. Sand was removed to restore the well closer to its original <br /> depth. As part of the Water Distribution Maintenance Program, and due to the <br /> problems encountered in Well#2, Well#3 will be inspected next, and necessary <br /> repairs done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.