My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-16-2005 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2005
>
08-16-2005 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 4:08:09 PM
Creation date
7/23/2018 4:08:09 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
8/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> August 16,2005 <br /> 6.1 Review 2006 Budget Schedule <br /> Staff has started the process of assembling the year 2006 budget. Commission reviewed <br /> proposed schedule of Travel&Training along with personnel projections. The Travel& <br /> Training budget is similar to 2005 with some minor changes. The personnel projections <br /> reflect the addition of two people. The first person is a supervisor for metering, generation, <br /> locating,and CAD operator. The second would be locator/CAD operator which is <br /> necessitated due to the new rule making,requiring water and waste water utilities to locate <br /> their facilities in the public right of way. John Dietz recommends checking with the City to <br /> see if we could share an employee. <br /> 6.2 Review Large Electric Capital Projects <br /> Otsego's growth,potential Target Data Center facility,and normal growth have initiated <br /> a number of possible projects for the electric department. A list of projects and costs were <br /> discussed along with the reasoning of why we should proceed now instead of wait. Staff is <br /> checking into bond rates with MMUA and conventional rates through the City. This will be <br /> revisited at the next Commission meeting. <br /> 6.3 Review Substation Transformer Purchases <br /> Due to the continued growth in Elk River,a$600,000 project was scheduled to upgrade <br /> two substations in 2006. The original plan was to purchase a new 15 MVA 69KV transformer <br /> for West Substation and the existing 12 MVA 69KV substation transformer would go to the <br /> North Substation. Staff is recommending holding off upgrading the North Substation at this <br /> time and instead upgrade the Otsego Substation. Bids for this transformer will be received on <br /> August 30,2005. This bid also contains an option for an additional 69KV transformer for <br /> Station 14 to accommodate the Target project. We will know more after the Target board <br /> meeting on September 14,2005. <br /> Other Business <br /> Bryan Adams reviewed the 2005 Electric Distribution Capital Projects. Staff recommends <br /> delaying two rebuild projects worth$245,000 and accelerating the Feeder 97 construction <br /> from Station 14 to West Business Park increasing the scope of project from$50,000 to <br /> $250,000. <br /> James Tralle moved to approve the change of the 2005 Electric Distribution Capital Projects. <br /> John Dietz seconded the motion. Motion carried 3-0. <br /> John Dietz inquired as to why the lawn at the power plant looks so bad. Glenn Sundeen <br /> informed him that the sprinkling system was recently fixed however,he will have it checked <br /> again as it still is not working properly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.