My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-2005 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2005
>
11-09-2005 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 4:04:54 PM
Creation date
7/23/2018 4:04:54 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
11/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> November 9,2005 <br /> 5.2 Review& Consider Health Insurance Costs <br /> A task group of staff consisting of two linemen,one water operator,one office employee, <br /> Bryan Adams and Theresa Slominski reviewed the health insurance costs for 2006 and <br /> prepared a proposal. In developing this proposal,items taken into consideration were the <br /> presentation Jodi Berg from the David Martin Agency gave and the feedback from employees <br /> resulting from this presentation. Past insurance coverage included single or family plans. <br /> Staff has asked if there could be a single+one coverage option added. Consensus of <br /> employees is to keep the Aware Gold plan and pay more out of pocket and also pay a portion <br /> of the Principal Dental coverage. Previously the employees paid 23%of the health insurance <br /> cost,the new proposal is for the employee to pay 25%with the added option of single+one <br /> coverage. This proposal results in an insurance premium cost increase from previous year of <br /> approximately 28.4%to the employee and 15%to the employer. <br /> Motion by James Tralle to accept the current Aware Gold insurance plan with the employee <br /> paying 25%employee on health and dental insurance coverage. Jerry Takle seconded the <br /> motion. John Dietz abstained. Motion carried 2-1. <br /> 5.3 Review Cash Flow Projections <br /> Twice annually electric and water financial projections are updated to ensure the <br /> necessary financial resources for the future. The updates are done at year end during the <br /> budgeting process and after the audit. The electric and water projections reflecting the 2006 <br /> budget assumptions were reviewed. Bryan also presented some figures stating that although <br /> we have significant reserves,they are still not as high as they should be and we need to look at <br /> increasing reserves in the future. James Tralle questioned if there would be significant power <br /> cost changes. Bryan responded that power costs will continue to rise along with fuel cost <br /> adjustments which usually increase in the summer months. <br /> 5.4 Review&Consider 2006 Budget <br /> 2006 proposed budget was reviewed. Discussion followed regarding the increase in <br /> WAC fees,water and electric rates,department needs and projects. Electric and water rate <br /> increases will be considered at the December 2005 commission meeting. <br /> 5.5 Review& Consider Electrical Cable Bids <br /> On October 18,2005,bids were received for 1000 KCMIL aluminum EPR electrical <br /> conductor for the Target Data Center project. The initial Bid request was for 120,000 LF <br /> however Target Data Center's recent decision to require only one feeder has changed the <br /> amount needed to 70,000 LF instead. Staff recommends accepting the lowest responsive bid <br /> from Burmeister Electric Company. <br /> Motion by James Tralle to accept the lowest responsive bidder Burmeister Electric Company <br /> for 70,000 LF of 1000 KCMIL EPR electrical cable. John Dietz seconded the motion. <br /> Motion carried 3-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.