My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-2000 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2000
>
07-11-2000 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 2:57:58 PM
Creation date
7/23/2018 2:57:57 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
7/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Regular Meeting of the Elk River Municipal Utilities Commission <br /> July 11, 2000 <br /> Due to the low bids, Staff recommended doing the complete project, instead of <br /> the partial option, and completing the project in approximately two years through side <br /> streets. <br /> John Dietz reported on the considerations of the City Council regarding the <br /> project, as well as further information about Main Street Parking. <br /> James Tralle moved to proceed with all of the watermain improvements, <br /> awarding the bid to Hardrives, Inc. at a total cost to the Utilities of$312,211.96 for the <br /> watermain component of the original bid, with contingency construction engineering, and <br /> field engineering to be added to total $365,000.00 for the project. George Zabee <br /> seconded the motion. Motion carried 3-0. <br /> 5.2 Review and Consider Wind Energy Program <br /> Bryan Adams reported on the wind generation program titled"Wellspring" <br /> offered by Great River Energy. The "Wellspring" Program is being offered to ask <br /> customers to become green energy pioneers by making a commitment to purchase wind <br /> energy at an additional cost. The cost to customers would be at a rate of$2.00/100 kwh <br /> block. <br /> George Zabee moved to limit the participation by the Elk River Municipal <br /> Utilities to offering brochures outlining the plan, and to enclose them as a stuffer in a <br /> monthly billing. James Tralle seconded the motion. Motion carried 3-0. <br /> 5.3 Review Feasibility Study for Western Area Improvements Phase IV <br /> The Amended Feasibility Study for the Western Area Improvements was <br /> presented and reviewed. The Study reflects a modified design that leaves 185"'Avenue <br /> unaffected. The water portion of this project will be paid through trunk assessments and <br /> assessments to Hoyt Partners. No contribution from the Elk River Municipal Utilities <br /> will be required. Construction is to be completed by Spring 2001. <br /> John Dietz added comments regarding City Council considerations on the last <br /> phase in the western area of the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.