My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-15-2000 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2000
>
02-15-2000 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 2:51:43 PM
Creation date
7/23/2018 2:51:43 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
2/15/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> February 15, 2000 <br /> 6.1 Review and Consider Bid Tabulation for Electric Wire Bids <br /> On February 9, 2000, bids were received to supply and deliver approximately <br /> 132,500 feet of electric wire for 2000 construction projects. Staff prepared a <br /> bid tabulation for Commission review, along with recommendations. <br /> John Dietz moved to approve the purchase as follows: <br /> 7500 LF 500 MCM Border States <br /> 40000 LF 4/0 URD Cable Burmeister Electric <br /> 60000 LF 1/0 URD Cable Wesco <br /> 10000 LF Brenau 600 V Cable Wesco <br /> 15000 LF Converse 600 V Cable Wesco <br /> 10000 LT Sweetbrair 600 V Cable Wesco <br /> to eliminate bids from King Wire and Resco,because of qualified bids, <br /> fluctuations in their quoted prices, time restraints and non-conformance <br /> to specifications. <br /> George Zabee seconded the motion. Motion carried 3-0. <br /> 6.2 Review Annual Report to City Council <br /> Bryan Adams presented the 1999 Annual Report to City Council for Commission <br /> review and consideration. Specific major accomplishments of 1999 and goals for <br /> 2000 were reviewed. <br /> 6.3 Review Revised Safety Manual <br /> Bryan Adams presented to Commission the revised and up-dated Safety Manual. <br /> Discussion followed with comments from Glenn Sundeen and Bryan Adams. <br /> 6.4 Review Air Conditioning Load Control <br /> A report prepared by Vance Zehringer, was reviewed and discussed. The report <br /> contained a Situation Analysis addressing the air conditioning program, with <br /> options to be considered. After lengthy consideration, Bryan Adams suggested <br /> that two years of education for consumers including advertising, brochures and <br /> bill stuffers be implemented, with promotion of heat pumps. At the end of two <br /> years the situation will again be reviewed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.