Laserfiche WebLink
• <br /> Mr. Harlicker <br /> September 10, 2003 <br /> Page Two <br /> storm sewer in Twin Lakes Road does not exceed existing conditions runoff from the <br /> Boulder Point site after development. <br /> Given that the roads are considered private in Boulder Point, the storm sewer piping <br /> system will also be considered a private utility. <br /> 6. The grading plan shows grading in the natural gas line easement on the west side of the <br /> development. Any grading in that easement will require authorization from the easement <br /> holder. <br /> 7. The emergency overflow route needs to be determined and shown on the grading plan in <br /> case the catch basins are plugged, showing that the runoff will make it to the pond without <br /> endangering any of the units. <br /> 8. No construction traffic for the internal improvements or the building of the units should be <br /> allowed to come off of County Road 12. It should all be required to come internally off of <br /> Vance Circle. It appears that this is what is anticipated as the rock construction driveway <br /> entrance is shown entering site off of Vance Circle. <br /> 9. An NPDES permit will need to be applied for since the site is over 1.0 acre. Also, more silt <br /> • fence protecting County Road 12 from erosion needs to be shown. <br /> If you have any questions regarding any of these comments,please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J. Maurer, P.E. <br /> TJM:sw <br /> • <br /> Ltr-091003-H a rl i cke r <br />