My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5.1 & 5.2
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2003
>
06-24-2003
>
Item 5.1 & 5.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 12:31:27 PM
Creation date
7/23/2018 12:31:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Planning Commission/P 03-04 West Oaks <br /> June 24,2003 <br /> Page 2 <br /> IIIAttachments <br /> • Location Map <br /> • Preliminary Plat <br /> • Development Plans <br /> • Memo from the City Engineer <br /> • Memo from Rebecca Haug, Environmental Technician <br /> • Memo from Chief of Police Jeff Beahen <br /> • Memo from Bruce West,Fire Chief <br /> Natural Features <br /> Wetlands <br /> There are about 5 acres of wetland on the site. They are linear and run diagonally across the <br /> northwest corner and across the central portion of the site. Some filling of the wetlands will <br /> be required for road construction. The applicant has met with the Technical Panel on <br /> wetland mitigation. A memo regarding their recommendation is attached. The wetlands will <br /> provide a nice amenity for the projects and will provide open space behind and between <br /> many of the townhouse units. <br /> Tree Preservation <br /> • Most of the site is wooded. Since most of the site will be graded,most of the trees will be <br /> removed. Trees will be preserved around the wetlands and in the wetland buffer areas as <br /> well as around the perimeter of the property. Some trees will also be preserved in the center <br /> of the loop. <br /> Park and Recreation <br /> The applicant is meeting the park dedication requirements with a mix of cash and land <br /> dedication. A 2.27-acre park is proposed in the southwesterly corner of the plat,providing a <br /> buffer between the large lot single-family development in Big Lake Township and the <br /> proposed West Oaks Development. Of the 2.27 acres, .36 acres is identified as wetland. As <br /> it is the City's policy to provide no credit for areas within wetlands or easements,the total <br /> area eligible for dedication is 1.91 acres. Typically,the City requires 10 percent land <br /> dedication, 100% cash dedication, or a combination thereof. Ten percent of the area <br /> proposed to be developed is 3.454 acres (34.47 acres x 10%). The remainder of the park <br /> dedication requirements will cash. <br /> Grading, Drainage and Utilities <br /> Grading, drainage and utility issues are addressed in the City Engineer's memo. <br /> • <br /> S:\PLANNING\Case Files\2003\P 03-04 West Oaks\6-24 pc MEMO.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.