Laserfiche WebLink
M <br /> Matrix 2: Comparison of Key Industrial Client Requirements by City of Elk River Product Offering <br /> Key Client Industrial Client Elk Path Gagne Country Mulvaney Point Elk River Brown Property Cascade <br /> Requirements Requirements Business Crossing Business Park Industrial Park <br /> Freeway Visibility Not important Highly visible Visible Visible Not visible Somewhat visible Not visible Not visible <br /> Highway/Freeway Depends on type of No No No No No No No <br /> Access (Interchange) industry Signaled intersection Signaled intersections Signaled intersection Signaled intersection Signaled intersection Signaled intersection <br /> —Waco Street 1/8 of a mile 3/8 of a mile 7/8 of 1 mile <br /> a mile <br /> Land Size 1.5 to 5 acres 80 acres,unplatted 18 acres,unplatted 3 acres,platted 1.78 and 6.43 acres, 2.79 to 5 acre lots (5), 45 acres,unplatted 46 acres <br /> platted platted Preliminarily platted <br /> into 1.5 to 3.3 acre <br /> lots <br /> Zoning Industrial Business Business Business Business Business Business Heavy Industrial <br /> Park/includes light Park/includes light Park/includes light Park/includes light Park/includes light Park/includes light <br /> manufacturing and manufacturing and manufacturing and manufacturing and manufacturing and manufacturing and <br /> research& research& research& research& research& research& <br /> development development development development development development <br /> Image Low Owner desires high TBD TBD Medium to High Medium to High TBD Very Low <br /> Design Standards: <br /> Building Design& Simple architecture, Detailed exterior Detailed exterior Detailed exterior Detailed exterior Detailed exterior Detailed exterior No detailed exterior <br /> Materials design standards, design standards, design standards, design standards, design standards, design standards, design standards. <br /> precast panels,metal, brick,stone,rock brick,stone,rock brick,stone,rock brick,stone,rock brick,stone,rock brick,stone,rock brick,stone,glass, <br /> CMU1,EIFS2,rock face block,glass, face block,glass, face block,glass, face block,glass, face block,glass, face block,glass, wood,stucco, <br /> face block metal, stucco metal,stucco metal,stucco metal,stucco metal,stucco metal,stucco concrete blocks and <br /> panels. <br /> Dock high and drive- Limitations on Limitations on Limitations on Limitations on Limitations on Limitations on <br /> in doors loading docks,doors loading docks,doors loading docks,doors loading docks,doors loading docks,doors loading docks,doors <br /> No limitation on Building height to 45 Building height to 45 Building height to 45 Building height to 45 Building height to 45 Building height to 45 Building height up to <br /> building height. feet feet feet feet feet feet 60 feet. <br /> Outdoor storage Outdoor storage Outdoor storage Outdoor storage Outdoor storage Outdoor storage Outdoor storage Outdoor storage <br /> needed. _prohibited prohibited prohibited prohibited prohibited prohibited allowed. <br /> Development Costs Low <br /> • Land $1.00 to$1.50/SF, $1.50 to$3/SF plus $1.50/SF plus TBD $4 to$6/SF Build to suit TBD $1.90/SF <br /> • Building including assessments assessments assessments <br /> Price/SF $28.00 to$52.00/SF <br /> • Other Fees Park Dedication Park Dedication Park Dedication Park Dedication Park Dedication <br /> III 41111 PageIli <br />