ID Ms. McPherson <br /> August 20, 2002 <br /> Page Two <br /> On Lot 1, Block 2 there are only three catch basins to pick up all of the parking lot and roof <br /> drainage. We question whether this number of catch basins is sufficient for the quantity of <br /> water expected from this portion of the development. <br /> 4. The proposed pond does not show an emergency overflow elevation. One should be <br /> designated and designed into the pond. Also, the pond appears to have 3:1 side slopes. <br /> The pond needs to be designed according to Best Management Practices, which would <br /> require flatter side slopes above the normal water level, including a bench area. <br /> 5. Sanitary sewer and water service are provided from the public utilities under Third Street. <br /> Sanitary sewer and watermain are run internal to both lots with individual services to each <br /> unit. The water system on Lot 1, block 2 needs to be looped. This can be accomplished <br /> by connecting to the water service stub provided for the lot. Drainage and utility easements <br /> will be required over the sanitary sewer and water for maintenance purposes. <br /> The utility plans appear to indicate that the existing sanitary sewer and water stubs are not <br /> proposed to be used, but instead, an open cutting of Third Street and new connections to <br /> the sanitary sewer and watermain in Third Street are proposed. The plan is somewhat <br /> unclear in this area. Further definition of the utility system is required. <br /> 6. An issue was raised at the staff review meeting relative to fire department access to all <br /> • <br /> points on the proposed building. In a memo dated August 6, 2002, from Fire Chief Bruce <br /> West, Mr. West laid out some of his concerns and quoted portions of the uniform fire code <br /> relative to fire access roads and access to within 150 feet of all points on commercial <br /> buildings. We would suggest that a follow-up meeting be held with the developers and the <br /> fire chief to ensure that the final proposal meets all of the requirements of the fire <br /> department. <br /> 7. The only plat comment we have is that a drainage and utility easement needs to be <br /> provided between Lots 5 and 6 to allow for an emergency overflow for the storm sewer <br /> pipe system. <br /> If you have any questions regarding any of these comments, please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> •JC1:1 riOa,e WA) <br /> Terry J. Maurer, P.E. <br /> TJM:sgw <br /> III <br /> Ltr-082002-McPherson[1] Howard R.Green Company <br /> CONSULTING ENGINEERS <br />