Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> December 11, 2001 <br /> 5.3 Administration Building Update <br /> Pat Klaers and representatives from Tushie Montgomery Architects appeared to discuss the plans for <br /> the City Hall expansion, including the time frames. Pat Klaers advised that the City Council is prepared to <br /> make decisions on the time frames for the planning on December 18, 2001. The City Council would like to <br /> be advised on the plans of the Utility by that time. <br /> The Architect representatives, and Pat Klaers presented plans with three options the City is <br /> considering, with Utility space included in all three plans. A proposal from the City's architect to do the <br /> necessary architectural/engineering work for the Utilities' portion of the project. <br /> George Zabee questioned the cost estimates, and the bidding process. He further added that he feels <br /> the present location of the Utilities is adequate for at least five years, and asks if the area could be made <br /> available in the future. The architects replied favorably, noting that construction of the Utility portion would <br /> be the final stage, with completion later in 2004. John Dietz approves of the Utility portion being at the tail <br /> end of the construction stage. It would guarantee that the Utility would be able to take advantage of the <br /> present bidding system, with cost savings. George Zabee is not prepared to make a decision at this meeting, <br /> preferring to postpone finalization until all Commissioners are present. <br /> It was decided to call a Special Meeting for Thursday, December 20, 2001 to discuss the option of <br /> the Utilities being included in the City Hall expansion. <br /> 5.4 Landfill Gas Project Update <br /> The remaining contract issues between Sherburne County, Waste Management, and ERMU have <br /> tentatively been resolved, as well as the engineering drawing review. Staff presented the Commission with <br /> spread sheets explaining the revenues, operation, and maintenance cost portions of the project. Staff <br /> recommends that Attorney Ron Black review each agreement with the Commission at a future meeting. <br /> 5.5 Substation North Connection Agreement <br /> The Connection Agreement between GRE and ERMU was presented for consideration and review by <br /> Commission. The terms and conditions of the agreement are similar to previous Connection Agreements <br /> except that in this case, GRE will pay for their transmission modifications and metering. A savings of <br /> $250,000 will be realized by the ERMU. At the same time, GRE would like to purchase the metering for <br /> station 14 and sub bank 1 & 2 along with 69 Kv switch at west sub bank 1, at approximately $21,500. <br /> The time frames for bidding, construction, and completion were discussed. Completion is anticipated <br /> in late Summer, 2002. <br /> George Zabee moved to authorize Staff to execute the Connection Agreement between GRE and Elk <br /> River Municipal Utilities. John Dietz seconded the motion. Motion carried 2-0. <br /> 6.1 Review & Consider Policy Change for Budget Billing <br /> The Minnesota Energy Security &Reliability Act will in 2002 require utilities to provide a customer <br /> budget billing plan. To comply with this requirement, Staff is proposing to add the Budget Helper Plan <br /> Section 13 of our Meter Deposit&Related Services Policy. <br />