Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> June 12, 2001 <br /> 5.2 Review and Consider Ridges of Rice Lake Electrical Bid Tabulation <br /> Bids for Ridges of Rice Lake cluster development were received on May 22, 2001. A bid tabulation <br /> reflecting the results of the bid were presented. Commission, at the May 8, ERMU meeting, authorized Staff <br /> to award a contract to the lowest responsive bidder, with the approval of the ERMU auditors. The lowest <br /> responsive bidder was M&P Utilities. Staff reviewed the bid tabulation with the Commission. <br /> John Dietz moved to formally approve the award of the contract to M&P Utilities. George Zabee <br /> seconded the motion. Motion carried 2-0. <br /> 5.3 Update Meter Reading Costs <br /> Radio read meter reading, contract, and in-house meter reading were reviewed. It was agreed that in <br /> the event that our present Contract Meter Reading service does not renew the contract, that at that time the <br /> ERMU would return meter reading to in-house. Staff was directed to return to a future meeting, information, <br /> and statistics for ERTs (Encoder/Receiver/Transmitter). <br /> 5.4 Review Response Time and Computer Use <br /> Certain operational people are now required to live within an 8 mile radius of the power plant for <br /> response time. A survey on response time, by other Utilities, and the local Fire Department were reviewed. <br /> Miles versus time, and staff recommendations were discussed. <br /> John Dietz moved to change the wording of the required 8 mile radius to 10 mile radius for certain <br /> operational employees. George Zabee seconded the motion. Motion carried 2-0. <br /> The subject of possible $1,200.00 interest free loans to employees for computer purchase was <br /> discussed. Commission and staff weighed the benefits of the program, with different viewpoints expressed. <br /> It was the consensus of the Commission to table the topic to the July Commission meeting. <br /> 5.5 Review Safety Program Evaluation <br /> A reviewal of the Elk River Municipal Utilities Safety Program by the MMUA Regional Safety <br /> Coordinator was presented and discussed. George Zabee commended the ERMU employees for the <br /> successful report. Discussion continued, with comments from Staff, Commission. <br /> 5.6 Review Financial Projections <br /> Many large projects expected in the next three years, such as wells, water towers, substations, <br /> administration building, and a plant garage may require debt financing. These projects, along with financing <br /> requirements were discussed. Updated financial cash flow projections were commented upon by Staff and <br /> Commission. The subject of rate increases,timing, economy, and cash were discussed. It was noted by <br /> George Zabee that he would prefer to see gradual increases of a modest nature rather than an abrupt large <br /> increase. John Dietz agreed with that thought. <br />