My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.4. SR 07-23-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
07-23-2018 SPECIAL
>
3.4. SR 07-23-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 10:36:49 AM
Creation date
7/20/2018 11:31:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUNICIPAL - 40 UNIT APARTMENT ELK RIVER <br />ELK RIVER, MN <br />BLD1807-00030 <br />7/11/2018 Page 2 <br /> <br /> <br />This information can be provided to you in alternative formats (Braille, large print or audio). <br />An Equal Opportunity Employer <br /> <br />1. Special Inspection Form (SIF). <br />Provide a completed and signed Special Inspection Testing and Inspection Schedule with <br />determined inspections in accordance with IBC Chapter 17. See Special Inspection requirements <br />listed on Sheet S1. The required third party inspection agencies must be contracted for said <br />work. Plan review cannot be completed and a building permit cannot be issued until a completed <br />SIF is submitted, reviewed and approved. [MR 1300.0130, Subp. 1] <br /> <br /> Signatures are required (where applicable) for the Owner, Contractor, Architect, <br />Structural Engineer of Record, Special Inspector (structural), Testing Agency, Special <br />Inspector (technical) and Fabricator. <br /> Where fabrication of structural load-bearing members and assemblies is being performed <br />on the premises of a fabricator’s shop (structural steel), special inspection of the <br />fabricated items shall be required. Exception: the fabricator is registered and approved to <br />perform such work without special inspection; provide documentation for review (copy of <br />AISC Certification). Copies of all required third party inspection reports and/or <br />observation logs must be submitted to the Building Official as soon as they are completed <br />for code review and record purposes. [IBC 1704.2.5.2] <br />o If the fabricator is not AISC certified, the SIF will need to be signed by a third <br />party testing agency that has been retained to provide Special Inspection on-site in <br />the fabricator’s shop (provide documentation). <br /> <br />2. Specification. <br />Is there a Specification book for this project? Please provide a copy. Please address. <br /> <br />3. Structural Calculations. <br />As part of the plan review process, certified sample structural calculations must be submitted for <br />the required structural review for this project. Sample structural calculations are to include the <br />title and year of the codes used, live loads, dead loads, wind loads on the primary system, wind <br />loads on the components, a sample of each type of lateral load resisting element, a sample of <br />each vertical load resisting element, and a sample of any special condition (and any specific <br />requested calculations, see Structural Comments below). Calculations are to be presented in a <br />clear, legible and organized manner conductive to a structural plan review. A table of contents <br />should be provided and pages are to be numbered for referencing purposes. A key plan or other <br />means of correlating the calculations with the drawings is to be provided. [MR 1300.0130, Subp. <br />1] <br /> <br />4. Certification. <br /> Geotechnical Report. <br /> Earthwork Certification. <br />The Geotechnical Report (by Independent Testing Technologies, Inc., Project No. 17-004, dated <br />02/21/2017) and the Earthwork Certification letter (dated 07/05/2018) are certified using the
The URL can be used to link to this page
Your browser does not support the video tag.