My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2003 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2003
>
04-08-2003 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2018 10:26:38 AM
Creation date
7/20/2018 10:23:46 AM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
4/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> April 8, 2003 <br /> James Tralle moved to authorize the purchase of the Inter-Tel phone system. Jerry Takle seconded <br /> the motion. Motion carried 3-0. <br /> 5.3 Review Underground Electric Construction Projects <br /> Sherburne County is planning to rebuild County Road 1 from the Country Club north in the 2005 <br /> time frame. The ERMU budget scheduled an underground feeder on County Road 1 in 2003. It is <br /> recommended that the project be delayed to 2005. Rebuild of an existing overhead line on County Road 13 <br /> to support acquisition areas 14, 16, & 17 is scheduled for 2004, but consideration should be given to doing <br /> the project in 2003 in replacement for the County Road 1 project. Due to right of way issues, it is believed <br /> that a better solution may be to construct a portion of the line to underground. Staff will return to the <br /> Commission with a recommendation after design and cost estimates are completed. <br /> 6.1 Review& Consider 2002 Audit <br /> Steve McDonald, Auditor from Abdo, Eick&Meyers appeared to present, and discuss the 2002 Audit <br /> of the Elk River Municipal Utilities. The Management letter provided the main source of discussion,noting <br /> no irregularities. A summary of the Utilities' operations, and an analysis of the Electric and Water funds <br /> was reviewed. Questions from Staff concerned cash reserves, net income, and long term debt. John Dietz <br /> asked Steve McDonald if the Utility would be prepared to comply with GASB, the required accounting, in <br /> the coming year. It was explained that the framework is in place, that the only thing needed is a formal <br /> policy. John Dietz requested that Staff use the same policy that the City uses. John Dietz thanked Steve <br /> McDonald for his appearance at the Commission meeting. <br /> James Tralle moved to receive and file the 2002 Audit. Jerry Takle seconded the motion. Motion <br /> carried 3-0. <br /> 6.2 Review Wage Request from ERMU Employees <br /> The request for annual salary and benefit adjustment from the operational employees was received, <br /> and considered. Bryan Adams reviewed the salary and benefit surveys, as well as the request for an <br /> employer matched contribution to an additional retirement plan. The Commission discussed the <br /> information,but chose to continue the matter to the next Commission meeting. <br /> John Dietz questioned Staff on the present policy for employee contributions to the health plan. He <br /> indicated that he would be in favor of separating family, and single coverage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.