My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Untitled
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2002
>
05-28-2002
>
Untitled
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2018 3:45:06 PM
Creation date
7/16/2018 3:45:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hcwarc R. Green Connoany <br /> May 15, 2002 <br /> File: 818010J-0240 <br /> Mr. Scott Harlicker <br /> Senior Planner <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River, MN 55330-5600 <br /> RE: ELK RIVER CROSSING DEVELOPMENT <br /> VSI CONSTRUCTION INC. <br /> Dear Mr. Harlicker: <br /> As requested we have reviewed the two drawings submitted for the VSI Construction, Inc. proposed <br /> strip mall, to be located in the Elk River Crossing Development. The drawings we reviewed were <br /> prepared by John Oliver and Associates and dated May 3, 2002. The drawings consisted of a <br /> grading, drainage, and an erosion control plan, and a landscaping plan. Based on our review we <br /> • would offer the following comments: <br /> 1. The site plan shows a shared access to Zane Street at the southeast corner of the lot. A future <br /> access to the lot to the south is provided. We would recommend that the access to the lot to the <br /> south be moved further west to line up with the front of the proposed strip mall. In it's current <br /> location it is far too close to the driveway at Zane Street to provide for efficient ingress and egress <br /> from two lots. <br /> 2. Additional information relative to the top of curve and bituminous elevations should be provided at <br /> the access to Zane Street. It appears that there is no high point to eliminate site drainage from <br /> flowing onto Zane Street. If this is the case, a high point needs to be installed to keep all the site <br /> drainage internal to the lot. <br /> 3. Access should be provided to the lot to the north lined up with the front of the building similar to <br /> the access to the lot to the south. <br /> 4. Sanitary sewer and water main stubs are shown from Zane Street to the property line. It is <br /> assumed that this is how the building will receive sanitary sewer and water service. The water <br /> service should include a six-inch extension with a hydrant located in the southerly islands in the <br /> parking lot. <br /> 5. The site plan should show the driveway locations if any exist on the east side of Zane Street. <br /> 6. We question the grade of the parking lot from the south side of the front of the building to the catch <br /> • basin located along the Zane Street curb line. It appears from the elevations shown on the plan <br /> that the grade in this direction is less that one percent; this is unacceptable for a parking lot. <br /> O:1Proj\818010J\0240\Ltr 5-15-02 Wallick.doc <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.