My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5.10
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2002
>
05-28-2002
>
Item 5.10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2018 3:40:51 PM
Creation date
7/16/2018 3:40:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• May 6, 2002 `\ �r• <br /> Sherburne Countyia <br /> PUBLIC WORKS DEPARTMENT =. <br /> City of Elk River �•��" <br /> Attn: Michele McPherson 425 Jackson Avenue <br /> 13065 Orono Parkway Elk River, MN 55330 <br /> P.O. Box 490 (763)241-7034 .800-594-5208 <br /> FAX(763) 441-2264 <br /> Elk River, MN 55330 <br /> Re: Grace Addition <br /> Dear Ms McPherson; <br /> As previously discussed we accept this proposal and have already granted access to CSAH 13. <br /> On the recommendation of consul from Sherburne County Assistant Attorney Timothy P. <br /> Brausen we will allow access_for the Grace Assembly of God Church to CSAH 13 at the <br /> southern boundary of the parcel. The placement of the access at the southern boundary provides <br /> the greatest possible spacing separation from Tyler Street NW. When the Jordan parcel (75-126- <br /> 3400; 12.98 acres) develops the access to CSAH 13 serving his property must be removed. <br /> An access permit has been granted for the Grace Assembly of God Church to CSAH 13 with the <br /> • following Conditions: <br /> 1. Pay the required permit and signage fees ($550). <br /> 2. We require 60' of right of way for CSAH 13 (as measured from the centerline of CSAH 13) <br /> be granted in fee title to Sherburne County. <br /> 3. The slopes of the access must be constructed at 1:6 within the right of way. <br /> 4. The developer is responsible for drainage studies. If a culvert is necessary within the right of <br /> way of CSAH 13, it must have 1:6 safety aprons and grates. Both the cost of the culvert and <br /> the installation are the responsibility of the developer. <br /> 5. A right turn lane is required at the proposed entrance and must be constructed according to <br /> Sherburne County standards as listed on the detail. <br /> 6. A bypass lane must be constructed to Sherburne County standards at the proposed entrance. <br /> 7. Slopes on the turn lanes and bypass lane must be 1:4. Turf establishment is covered on the <br /> enclosed detail. We recommend the notification (by church representatives) of the <br /> landowners that will be impacted by the bypass lane. Some tree trimming may be necessary. <br /> 8. Road signs will be installed by the public works department. The developer must notify the <br /> public works department for installation. <br /> 9. Make all pavement marking changes as necessary. <br /> If you have any questions, please call me at 241-7034 <br /> Sincezelay, <br /> • <br /> Richard D. Corbin <br /> Sherburne County Public Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.